[0027] The present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.
[0028] see figure 1 , image 3 , Embodiment 1 is an installation structure of a monorail beam track, which consists of a monorail beam track 1, a floor slab 2, a concrete beam 3, a first connecting vertical plate 7, a connecting horizontal plate 8, a leveling and slope leveling layer 9, a waterproof layer 10, the first Two connecting risers 12 constitute. The floor 2 is installed on the concrete beam 3 of the building. The floor 2 on both sides of the concrete beam 3 is symmetrically processed with through-hole structures. The cross-section of the through-hole structure is circular or rectangular. side wall. According to the size of the shear bolts, the open hole structure is larger than the diameter of the shear bolts. For example, if the diameter of the shear bolt is M20, a hole with a diameter of 30 to 50mm can be opened when using round steel;...