Power grid capital construction project report data processing method
A processing method and report data technology, applied in the direction of electrical digital data processing, data processing applications, special data processing applications, etc., can solve the problems of inaccurate results, large amounts of manual intervention in settlement reports, etc., and achieve the effect of reducing lean management
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0070] A specific embodiment of the present invention discloses a method for processing report data of power grid infrastructure projects, such as figure 1 shown, including the following steps:
[0071] S1. Obtain the cost clauses involved in this infrastructure project and the calculation method of each cost clause according to the grid infrastructure project cost item standard.
[0072] S2. Using the fee clause as a keyword, search to obtain the file set including the above-mentioned fee for this infrastructure project, and obtain and store the data corresponding to each fee clause in all files in the file set. Preferably, the data includes estimated data, detailed data and settlement data.
[0073] S3. Build a data verification rule base to verify the stored data corresponding to each fee clause. If the check fails, an alarm-driven correction is issued for the failed fee clauses until all fee clauses pass the check.
[0074] S4. Calculate the data corresponding to each co...
Embodiment 2
[0077] Optimizing on the basis of Example 1, such as figure 2 As shown, step S1 can be further refined into the following steps:
[0078] S11. Extract the keywords related to the cost in the power grid project construction forecast and standard documents of the bill of quantities, and obtain all the cost items involved in this infrastructure project, and the calculation formula for calculating the higher-level cost items in each cost item based on the lower-level cost items;
[0079] S12. Automatically classify all the expense clauses involved in this infrastructure project according to the preset classification conditions, and obtain budgetary summary categories, construction engineering categories, installation engineering categories, equipment purchase categories, and other categories of expense clauses;
[0080] S13. Perform word segmentation matching for each of the above-mentioned fee clauses, delete duplicate fee clauses, verify the applicability of the remaining claus...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com