Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A data processing method for power grid infrastructure project report

A processing method and report data technology, which is applied in the fields of electronic digital data processing, data processing applications, natural language data processing, etc., can solve the problems of large amount of manual intervention in settlement reports, inaccurate results, etc.

Active Publication Date: 2022-03-15
YGSOFT INC
View PDF15 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In view of the above analysis, the embodiment of the present invention aims to provide a report data processing method for power grid infrastructure projects to solve the problems in the prior art that a large amount of manual intervention is required to generate settlement reports and the obtained results are inaccurate

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A data processing method for power grid infrastructure project report
  • A data processing method for power grid infrastructure project report
  • A data processing method for power grid infrastructure project report

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0070] A specific embodiment of the present invention discloses a method for processing report data of power grid infrastructure projects, such as figure 1 shown, including the following steps:

[0071] S1. Obtain the cost clauses involved in this infrastructure project and the calculation method of each cost clause according to the grid infrastructure project cost item standard.

[0072] S2. Using the fee clause as a keyword, search to obtain the file set including the above fees for this infrastructure project, and obtain and store the data corresponding to each fee clause in all files in the file set. Preferably, the data includes estimated data, detailed data and settlement data.

[0073] S3. Build a data verification rule library to verify the stored data corresponding to each fee clause. If the check fails, an alarm-driven correction will be issued for the failed fee clauses until all fee clauses are verified.

[0074] S4. Calculate the data corresponding to each cost...

Embodiment 2

[0077] Optimizing on the basis of Example 1, such as figure 2 As shown, step S1 can be further refined into the following steps:

[0078] S11. Extract the keywords related to the cost in the power grid project construction forecast and standard documents of the bill of quantities, and obtain all the cost items involved in this infrastructure project, and the calculation formula for calculating the higher-level cost items in each cost item based on the lower-level cost items;

[0079] S12. Automatically classify all the expense clauses involved in this infrastructure project according to the preset classification conditions, and obtain budgetary summary categories, construction engineering categories, installation engineering categories, equipment purchase categories, and other categories of expense clauses;

[0080] S13. Perform word segmentation matching for each type of fee clause above, delete duplicate fee clauses, verify the applicability of the remaining clauses, and de...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a method for processing power grid infrastructure engineering report data, belongs to the technical field of infrastructure engineering processing, and solves the problems that a large amount of manual intervention is required to generate a settlement report in the prior art and the obtained results are inaccurate. The method includes the following steps: obtaining the cost clauses involved in this infrastructure project and the calculation method of each cost clause according to the cost item standard of the power grid infrastructure project; using the cost clause as a keyword, searching and obtaining the documents including the above-mentioned fees for the capital construction project Set up and obtain the data corresponding to each fee clause in the file set; build a data verification rule base to verify the data corresponding to each fee clause, if it does not pass, the alarm drives the correction until all fee clauses are verified and passed; The data corresponding to the verified cost clauses are calculated according to the calculation method, and a final account statement of the power grid infrastructure project is generated. The method can intelligently, efficiently and accurately help the user to issue the as-built final account report without manual intervention.

Description

technical field [0001] The invention relates to the technical field of infrastructure project processing, in particular to a method for processing report data of a power grid infrastructure project. Background technique [0002] At present, the preparation of final account statements for power grid infrastructure projects is generally done manually. Due to the large-scale construction of power grid infrastructure projects, wide-ranging business areas, and many units involved, even if the automatic reporting method is used, a large amount of manual intervention is required, which is heavy, difficult, and error-prone. [0003] The current automatic generation tools for the completion and final settlement statements of power grid infrastructure projects mainly include two types: one is to automatically generate final settlement statement data based on actual data such as settlement reports, transfer lists, and accounts. The problem is that it needs to be based on actual constru...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/06G06Q50/06G06F40/186G06F40/289G06F40/30
CPCY04S10/50
Inventor 蒋秋霞王伟健郭伙平
Owner YGSOFT INC
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products