Unlock instant, AI-driven research and patent intelligence for your innovation.

Data forwarding tunnel determination method, access and mobility management equipment and base station

A technology for mobile management equipment and determination methods, which is applied in network data management, electrical components, wireless communication, etc., and can solve problems such as impact and increased signaling consumption

Active Publication Date: 2019-05-24
DATANG MOBILE COMM EQUIP CO LTD
View PDF7 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

When it is necessary to switch to the 5G system in the future, the 4G base station will indicate whether there is forwarded data on a certain QoS flow according to the format (PDUSession+QoS flow) in the target system to which the current bearer is mapped. In this way, the existing The EPS system has an impact and increases signaling consumption

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Data forwarding tunnel determination method, access and mobility management equipment and base station
  • Data forwarding tunnel determination method, access and mobility management equipment and base station
  • Data forwarding tunnel determination method, access and mobility management equipment and base station

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0088] In order to make the technical problems, technical solutions and advantages to be solved by the present invention clearer, the following will describe in detail with reference to the drawings and specific embodiments.

[0089] Aiming at the problem of data forwarding during the handover process from the current EPS to 5G system, which affects the existing EPS system and increases signaling consumption, the present invention provides a data forwarding tunnel determination method, through the handover from EPS to 5G system The process determines the data forwarding tunnel, realizes the data forwarding tunnel allocation for switching from EPS to 5G system without affecting the existing EPS system and increasing signaling consumption, and ensures the completion of data forwarding.

[0090] Such as figure 1 As shown, a method for determining a data forwarding tunnel in an embodiment of the present invention is applied to an access and mobility management device AMF, includin...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a data forwarding tunnel determination method, access and mobility management equipment and a base station. The method comprises the following steps of: receiving data forwarding information of target UE forwarded by an MME, and acquiring a QoS flow configured for each bearer of the target UE by a 5G core network and a mapping relation between the bearer and the QoS flow; wherein the data forwarding information comprises a bearing list distributed to the target UE by the EPS, and an indication of whether data forwarding exists in each bearing corresponding to the targetUE determined by the 4G base station; sending the data forwarding information, the configured QoS flow and the mapping relation between the bearer and the QoS flow to a target 5G base station; and receiving the forwarding tunnel information of the 5G base station configured by the target 5G base station for the target UE according to the data forwarding information, the configured QoS flow and themapping relationship between the bearer and the QoS flow. According to the scheme provided by the embodiment of the invention, the tunnel allocation of the data forwarding of switching from the EPS to the 5G system is realized under the conditions that the existing EPS system is not influenced and the signaling consumption is not increased, and the completion of the data forwarding is ensured.

Description

technical field [0001] The present invention relates to the field of communication technology, in particular to a method for determining a data forwarding tunnel, access and mobility management equipment, and a base station. Background technique [0002] With the development of mobile communication systems, the development of the fifth-generation mobile communication 5G system is changing with each passing day. The 5G system can provide user equipment UE with greater bandwidth and higher transmission rates. Because the 5G network deployment in the early stage cannot be too mature, and the current LTE network coverage and technology are very mature; in order to provide better services to UEs and ensure business continuity, support UEs in 5G systems and current mainstream LTE systems Seamless switching between is particularly important. [0003] The protocol data unit session PDU session of the 5G system is different from the public data network PDN connection form of the evo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): H04W36/00H04W36/14H04W36/30
CPCH04W36/0022H04W36/02H04W8/12H04W36/0016H04W36/0044
Inventor 孙建成王胡成汪颖
Owner DATANG MOBILE COMM EQUIP CO LTD