Detachable hanging basket for high-altitude steel reinforced concrete corridor construction and construction method
A concrete and dismantling technology, which is applied in the processing of building materials, scaffolding for housing structure support, housing structure support, etc., can solve the problems of long construction period, high cost of erecting formwork, safety, etc., and achieves simple construction, easy installation and safety. Demolition, the effect of good economic benefits
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] Such as Figure 1-3 As shown, a detachable hanging basket for the construction of high-altitude steel-concrete corridors includes concrete beams that are fixedly connected to the steel main beam 13 and the steel secondary beam 12 through high-strength bolts 14, and the concrete main beam 13 is provided with There is a second I-beam 2, and the left and right ends of the second I-beam 2 are respectively provided with a first suspender 4 and a second suspender 41 through; the first suspender 4 and the second suspender 41 The end close to the second I-beam 2 is provided with a nut 9 and a special-shaped pad 15 in turn, and the end away from the second I-beam 2 is sequentially provided with a nut 9, a special-shaped pad 15, a channel steel 3, and a template 4; The outer side of the first suspension rod 4 is provided with a dense mesh 10, and the inner side is provided with a safety net 11; a steel pipe 6 is provided between the channel steel 3 and the template 7; the first s...
Embodiment 2
[0026] Such as Figure 1-3 As shown, a construction method for a detachable hanging basket used in the construction of high-altitude steel concrete corridors includes the following steps:
[0027] a. First, pre-embed the short steel pipe 8 in the concrete beam, and weld the second I-beam 2 and the secondary steel beam 12 at the upper and lower ends respectively. The second I-beam 2 and the secondary steel beam 12 are connected to the short steel pipe 8 The contact positions are respectively provided with through holes;
[0028] b. Then, place the first suspender 4 and the second suspender 41 respectively in the short steel pipe 8, respectively install special-shaped spacers 15 near the end of the second I-beam 2, and tighten them with nuts 9; the first suspender 4 Install the channel steel 3, the steel pipe 6, and the template 7 with the other end of the second suspender 41 in sequence, and use the special-shaped pad 15 and the nut 9 to fix the connection;
[0029] c, then t...