Tower crane foundation and construction method thereof

A tower crane foundation and construction method technology, applied in the field of building infrastructure, can solve problems such as large leakage hazards, difficult construction, bolt corrosion, etc., to achieve the effects of ensuring the foundation of force, ensuring integrity, and saving costs

Pending Publication Date: 2019-06-25
ANHUI TONGJI CONSTR GRP
View PDF0 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In some tower crane foundations, the water-stop steel plate is located on the tower crane foundation, and the steel bars of the tower crane foundation at the water-stop steel plate must be disconnected, which is extremely unfavorable to the force of the tower crane foundation; Holes are opened, which makes construction difficult; the steel bars at the water-stop steel plate must be welded to the water-stop steel plate, which makes it difficult to control the construction quality; the upper and lower side forms at the water-stop steel plate need to be disconnected, and the construction is difficult due to the possibility of hanging the formwork
[0004] There are also many tower crane foundations that rely on water-stop steel plates for water isolation, and there are great hidden dangers of leakage; many tower crane foundations are in a state of water accumulation for a long time. Although there are water pumps, it is inevitable that the pumps will not dry or the water pumps will be damaged, resulting in corrosion of the bolts. Safety The hidden danger is huge; moreover, many rafts reserve steel bars above the foundation of the tower crane, which makes the installation and removal of the tower crane more difficult. After the removal of the tower crane, additional concrete needs to be used to fill the foundation pit, and the construction cost increases

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tower crane foundation and construction method thereof
  • Tower crane foundation and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention will be further clarified below in conjunction with specific drawings.

[0030] Combine figure 1 , 2 As shown, the present invention provides a tower crane foundation, including a tower crane base body 10, the upper end of the tower crane base body 10 extends outwards to form a cantilever plate 11 between the cantilever plate 11 and the basement raft 20 The post-pouring belt 30, and between the post-pouring belt 30 and the pick plate 11, and between the post-pouring belt 30 and the basement raft 20, are provided with a water-stop steel plate 40 that spans the junction of the two. The upper end surface of 30 is flush with the upper end surface of the basement raft 20 and is 30 mm lower than the upper end surface of the tower crane base body 10.

[0031] In the present invention, a pick plate 11 is formed around the upper e...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Widthaaaaaaaaaa
Widthaaaaaaaaaa
Login to View More

Abstract

The invention belongs to the technical field of building foundation structures, in particular to a tower crane foundation and a construction method thereof. The tower crane foundation comprises a tower crane foundation body, wherein the periphery of the upper end of the tower crane foundation body extends outwards to form bridging plates; post-casting belts are arranged between the bridging platesand basement raft plates; water-stopping steel plates crossing the junction of the post-casting belts and the bridging plates and the junction of the post-casting belts and the basement raft plates are arranged between the post-casting belts and the bridging plates as well as between the post-casting belts and the basement raft plates; the upper end surface of each post-casting belt is flush withthe upper end surface of each basement raft plate, and is 30 mm lower than the upper end surface of the tower crane foundation body. According to the tower crane foundation and the construction method thereof, involved in the invention, the periphery of the upper end of the tower crane base body extends outwards to form the bridging plates, the bridging plates can be used for fixing the water-stopping steel plates, so that the destruction to the steel bars of the tower crane foundation body caused by the arrangement of the water-stopping steel plates in traditional tower crane foundation design is avoided, the integrity of the steel bars of the tower crane foundation body is ensured, and a better stress foundation of the tower crane foundation is ensured.

Description

Technical field [0001] The invention belongs to the technical field of building basic structures, in particular to a tower crane foundation and a construction method thereof. Background technique [0002] As a common lifting equipment on construction sites, tower cranes are mainly used for lifting construction materials such as steel bars, wood corrugated, and scaffold pipes. They are essential equipment for construction sites. [0003] In some tower crane foundations, the water-stop steel plate is located on the tower crane foundation, and all the tower crane foundation steel bars at the water-stop steel plate must be disconnected, which is extremely unfavorable to the force of the tower crane foundation; when the raft steel bars extend into the tower crane foundation, they need to be placed on the side formwork Opening a hole makes the construction difficult; the steel bars at the water-stop steel plate must be welded to the water-stop steel plate, which makes it difficult to con...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D27/42E02D31/02E02D27/01
Inventor 张勋桂吴晓东冯海荣高先志马成