Method for grouting piles by hole forming through inflating
A cast-in-situ pile and hole-forming technology, which is applied to sheet pile walls, buildings, and foundation structure engineering, can solve problems such as the inability to guarantee the stability of hole walls and the limited diameter of prefabricated piles, so as to solve engineering problems and avoid waste , the effect of improving stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Example 1: Such as figure 1 The shown method of inflating a bored bored pile includes the following steps:
[0025] Step 1: Prefabricate the geomembrane bag 1. The geomembrane bag 1 is provided with two layers, the inner layer is the inner ring 11, and the outer layer is the outer ring 12. figure 1 As shown, the inner and outer surfaces of the inner and outer rings 12 of the geomembrane bag 1 are provided with a plurality of small bumps with unevenness, the diameter of the bumps is 0.1 cm; the depth of the geomembrane bag 1 is greater than the designed pile depth A depth of 100 cm; the outer ring 12 of the geomembrane bag 1 has the same radius as the pile foundation, and the radius of the inner ring 11 of the geomembrane bag 1 is 5 cm smaller than the radius of the outer ring 12 of the geomembrane bag 1;
[0026] Step 2: Make a hole in the center of the pile, the depth of which is 50cm deeper than the designed depth of the pile foundation; then insert the prefabricated geomem...
Embodiment 2
[0030] Example 2: Such as figure 1 The shown method of inflating a bored bored pile includes the following steps:
[0031] Step 1: Prefabricate the geomembrane bag 1. The geomembrane bag 1 is provided with two layers, the inner layer is the inner ring 11, and the outer layer is the outer ring 12; image 3 As shown, the inner and outer surfaces of the inner and outer rings 12 of the geomembrane bag 1 are evenly provided with attachment strips; the depth of the geomembrane bag 1 is 150 cm deeper than the designed pile depth; the outer ring 12 and the pile radius of the geomembrane bag 1 Similarly, the radius of the inner ring 11 of the geomembrane bag 1 is 20 cm smaller than the radius of the outer ring 12 of the geomembrane bag 1;
[0032] Step 2: Make a hole in the center of the pile, and the depth of the hole is 80cm deeper than the designed depth of the pile foundation; then insert the prefabricated geomembrane bag 1 into the center of the pile;
[0033] Step 3: Measure and calcul...