A technology for structures and cracks, applied in the direction of building construction, construction, building maintenance, etc., can solve problems such as unsatisfactory plugging effect, secondary leakage, and increased maintenance costs, so as to reduce filling dead space and reduce secondary leakage probability, and the effect of improving plugging efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] Embodiment 1: In this embodiment, the width of the crack is 3 mm, the length of the crack is 20 cm, and the depth is about 4 cm. According to the width, length and depth of the slit of the present embodiment, the length of the slit 2 is determined to be 22cm, the width of the slit 2 is 1.5cm, and the depth of the slit 2 is 1cm; each of the two sides of the slit needs to drill 3 obliques. Hole 5, the diameter of inclined hole 5 is 10mm.
[0030] S1: Clean the surface of the structural crack 1 of the structure, use a cutting machine to create a slot 2 on the surface of the structural crack 1, after the slotting is completed, remove the impurities in the slot 2, and place the pipe dragging mold in the slot 2 , and then pour the sealing material into the slot 2, and before the sealing material is completely solidified, the drag tube mold is pulled out, so that a grouting channel 4 is reserved in the leak-stopping layer 3, and the grouting channel 4 is connected with the St...
Embodiment 2
[0035] Embodiment 2: In this embodiment, the width of the crack is 5 mm, the length of the crack is 15 cm, and the depth is about 8 cm. According to the width, length and depth of the crack of this embodiment, the length of the groove 2 is determined to be 28cm, the width of the groove 2 is 3cm, and the depth of the groove 2 is 1cm; 2 oblique holes need to be drilled on both sides of the crack 5. The diameter of the inclined hole 5 is 8mm.
[0036] S1: Clean the surface of the structural crack 1 of the structure, use a cutting machine to create a slot 2 on the surface of the structural crack 1, after the slotting is completed, remove the impurities in the slot 2, and place the pipe dragging mold in the slot 2 , and then pour the sealing material into the slot 2, and before the sealing material is completely solidified, the drag tube mold is pulled out, so that a grouting channel 4 is reserved in the leak-stopping layer 3, and the grouting channel 4 is connected with the Struc...
PUM
| Property | Measurement | Unit |
|---|---|---|
| diameter | aaaaa | aaaaa |
| width | aaaaa | aaaaa |
| length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 