The invention provides a rapid leaking stoppage method for a dike breach, and relates to the technical field of
hydraulic engineering, and the rapid leaking stoppage method comprises the following steps: S1, breach fixing: fixing two ends of the breach by using steel sheet piles and steel
pipe columns capable of bearing corresponding
water pressure at stable positions of edges of two ends of the breach; s2,
pipe bodies are laid, specifically, a plurality of
pipe bodies are laid from the two ends of the dike breach in the direction perpendicular to the dike; s3, piling is conducted on the side, away from the river channel, of the pipe body along the edge of a pipe opening of the laid pipe body; s4, the pipe body is blocked, and a corresponding blocking material is selected to block a pipe opening of the pipe body; s5, a rockfill dam is built, and after sundries and soft soil on the outer side of the
crevasse are cleaned, the rockfill dam is laid on the outer side of the pipe body in the
crevasse; through rapid throwing and stacking of the steel sheet piles, the steel pipe piles and the pipe bodies, the
crevasse with the large
water level difference can be preliminarily blocked within a short time, and the crevasse is adjusted and reinforced through subsequent reinforcing measures.