Power supply station on-site operation safety supervision risk management and control system

A technology of on-site operation and management and control system, applied in the direction of instruments, data processing applications, forecasting, etc., can solve problems such as inability to guarantee emergency work, inability of power grid system to perform emergency prediction and early warning, blind command command to increase safety risks, etc., to achieve emergency response Improve work efficiency, deliver efficiently and smoothly, and ensure timeliness and accuracy

Pending Publication Date: 2019-07-05
STATE GRID JIANGSU ELECTRIC POWER CO LTD NANTONG POWER SUPPLY BRANCH
View PDF3 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Aiming at the deficiencies of the prior art, the present invention provides a safety supervision risk management and control system for on-site operation of the power supply station, which solves the problem that the existing power grid system cannot perform emergency prediction and early warning, blind command command increases safety risks, and cannot respond to emergency job security issues

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power supply station on-site operation safety supervision risk management and control system
  • Power supply station on-site operation safety supervision risk management and control system
  • Power supply station on-site operation safety supervision risk management and control system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0030] In describing the present invention, it should be understood that the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", " Back", "Left", "Right", "Vertical", "Horizontal", "Top", "Bottom", "Inner", "Outer", "Clockwise", "Counterclockwise", "Axial" , "radial", "circumferential" and other indicated orientations or positional relationships are based on the orientations or positional relationships shown...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a power supply station on-site operation safety supervision risk management and control system, and relates to the electric power related technical field. The system comprisesa plurality of servers and a command center end, the servers are bidirectionally and electrically connected with the command center end, and comprise a first-aid repair site data integration module, aconstruction site operation data acquisition module, a monitoring module, an information processing module and an information transmission module. The command center end comprises a situation judgment module, a prediction analysis module and a command module, wherein the output ends of the first-aid repair site data integration module and the construction site operation data acquisition module are electrically connected with the input end of the monitoring module, the output end of the monitoring module is electrically connected with the input end of the information processing module, and theoutput end of the information processing module is electrically connected with the input end of the information transmission module. According to the system, the information full-time and space and full-element visualization and automation of the emergency prediction and early warning and the precaution and response disposition is realized, and the efficient operation of the emergency work is guaranteed.

Description

technical field [0001] The invention relates to the technical field related to electric power, in particular to a risk management and control system for on-site operation safety supervision of a power supply station. Background technique [0002] China proposes to explore the construction of a global energy internet to promote a clean and green way to meet global electricity demand. To implement the national strategy, promote the energy revolution, respond to climate change, and realize the coordinated development of the world economy, society, and environment, State Grid Corporation of China is exploring and practicing a safe, clean, and sustainable energy development path from a global perspective. The power grid has stepped into UHV In this era, the way of transmission, supply and use of electric energy needs to undergo major changes. The heavy responsibility for the protection of UHV transmission lines, coupled with the large-scale and centralized development of regiona...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/04G06Q50/06
CPCG06Q10/0635G06Q10/04G06Q50/06
Inventor 许志龙傅靖朱建宝孙玉玮陈宇马青山施烨邓伟超俞鑫春
Owner STATE GRID JIANGSU ELECTRIC POWER CO LTD NANTONG POWER SUPPLY BRANCH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products