Construction Method of Concrete Surface Layer of Wharf Yard Road
A technology of concrete surface and construction method, which is applied to the coagulation pavement, roads, roads and other directions of on-site paving, can solve the problems of high construction difficulty, difficult construction technology to meet requirements, complex geographical conditions, etc., and achieve the effect of reducing construction difficulty.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2020-12-08
Abstract
Description
technical field
[0001] The invention relates to the technical field of road construction, in particular to a construction method for a concrete surface layer of a wharf yard road. Background technique
[0002] In the construction of the wharf yard, the construction scope of the road concrete surface usually covers the road surface within the land area of the berth and the road surface connecting the entry and exit ports. It has high design requirements for the thickness and flexural strength of the concrete structure, and the geographical conditions are complex. , The construction difficulty is high, and the traditional road surface construction technology is difficult to meet the demand. Contents of the invention
[0003] In order to overcome the deficiencies of the above-mentioned prior art, the present invention provides a road concrete surface construction method to meet the construction needs of the wharf yard.
[0004] The technical scheme that the present inventi...
Examples
Embodiment Construction
[0050] A construction method for the road concrete surface of a wharf yard of the present invention comprises the following steps:
[0051] Step 1: Substrate detection
[0052] Before the construction of the road concrete surface, ensure that the compaction degree of the water stable base in the filling section is ≥ 97%, the deflection value is < 43.3 (1 / 100mm) and the compressive strength is ≥ 3MPa, and the compressive strength of the roller compacted concrete base in the excavation section is ≥ 4MPa, bending and tensile strength ≥ 2MPa;
[0053] Step 2: Measure and set-out
[0054] After the water-stabilized and roller-compacted concrete base has been checked and accepted, the construction line is set out, the center line and side piles are placed, and the concrete block line of the construction drawing is checked on site;
[0055] Step 3: Template Installation
[0056] The formwork adopts shaped steel formwork, and the thickness of the formwork is the same as that of the...