An auxiliary platform for underwater concrete column construction
An underwater concrete and auxiliary platform technology, applied in water conservancy projects, underwater structures, artificial islands, etc., can solve the problems of slow construction progress, high labor and equipment costs, shorten the construction period, save labor costs, installation and disassembly handy effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] Such as Figure 1-7 As shown, an auxiliary platform for underwater concrete column construction includes a water bearing platform 1 above the water surface. The water bearing platform 1 is preferably floating on the water surface. The middle position of the water bearing platform 1 has a The rectangular construction work channel 101 on the upper and lower surfaces is provided with the digging equipment 7 for excavating the foundation hole for pouring the construction by four fixed rods 702 on the top of the rectangular construction work channel 101, and is respectively provided on the four sides of the bottom of the rectangular construction work channel 101. There is a set of fence fixing device 2;
[0046] Each group of enclosure fixing devices 2 includes a fixed base plate 203 arranged in parallel on the bottom edge of the rectangular construction operation channel 101, and a through groove 204 parallel to its length direction is arranged on the fixed base plate 203, ...
Embodiment 2
[0062] This embodiment is a further improvement made on the basis of Embodiment 1, as figure 2 As shown, the two ends of each fixed base plate 203 are erected on two support beams 201 on both sides of the bottom of the rectangular construction operation channel 101, and slide rails are arranged on the two support beams 201 along their length direction, so The bottom of the fixed base plate 203 has a chute matched with the slide rail, and an adjustment oil cylinder 202 is arranged on the rectangular construction operation channel 101 between the two support beams 201, and the free end of the piston rod of the adjustment oil cylinder 202 is connected to the fixed base plate 203. The middle part is hinged, and the fixed base plate 203 is driven to slide back and forth along the support beam 201 by adjusting the expansion and contraction of the piston rod of the oil cylinder 202, thereby adjusting the distance between the other fixed base plate 203 opposite to it.
Embodiment 3
[0064] This embodiment is a further improvement made on the basis of Embodiment 2, as figure 2 As shown, the four fixed rods 702 are located on the two diagonals of the rectangular construction operation channel 101, and when each fixed base plate 203 slides to the end of the support beam 201, the circular fixed channel 205 is located on two adjacent sides. The inside of the triangle surrounded by the first fixed rod 702, so that there is an operation gap between the guide fixed rod 3 inserted therein and the nearest fixed rod 702.