A large-scale heavy object and control method technology, which is applied in the direction of walking bridge cranes, cranes, load blocks, etc., can solve the problems of low access efficiency, large volume, and a large number of human participation, so as to increase the scope of application and solve the problems of storage Inconvenience and safety improvement effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0038] The technical solutions of the present invention will be described in further detail below through specific implementation methods.
[0039] Device embodiment
[0040] Such as figure 1 Shown is the front view of the crane system in this embodiment, figure 2 It is the rear view of the crane system in this embodiment, and the crane system includes two supporting frames arranged in parallel, such as figure 1 As shown in 26, the middle area of the two support frames is a storage place, and the upper end of the support frame is provided with a crane end beam, such as figure 1 Shown in 17 and 18, the two crane end beams are also parallel, so that a crane cart 19 can be set between the two crane end beams, so that the crane cart 19 can move along the two crane end beams. The crane trolley comprises two crossbeams 27 arranged in parallel, and the two ends of the crossbeam 27 are arranged on the end beam of the crane by wheels, and the two crossbeams of the crane trolley 1...