Construction of interval hesitant fuzzy graph decision-making method considering relevance and priority relationship
A technology of prioritizing relationships and decision-making methods, applied in fuzzy logic-based systems, relational databases, database models, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0088] The present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.
[0089] According to the needs of strengthening the construction of talents in universities and attracting scarce talents to the teaching team to effectively improve the structure of the talent team, a Chinese university management school has carried out the introduction of overseas excellent talents. After preliminary review by human resources experts, there are 5 applicants Entered the interview process. Aiming at the multi-attribute decision-making problem in the introduction of outstanding overseas talents in this university, the method of the present invention will be further described in detail.
[0090] like Figures 1 to 3 As shown, the construction of a kind of interval hesitant fuzzy graph decision-making method considering relevance and priority relationship provided by the present invention includes the following steps: the decision-making...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com