[0027] see figure 1 , figure 2 , image 3 , this embodiment provides a construction method for a building-through structure of a strong electric well, wherein the building-through structure includes a bridge frame 11 , a line pipe 12 and a bus duct 13 .
[0028] This construction method comprises the following steps:
[0029] The floor 14 in the vertical shaft reserves the hole K1 that allows each floor-through structure to pass through; wherein the holes K1 of each floor-through structure are independent of each other and adapt to the outer contour of each floor-through structure; the blocking area can be reduced by this arrangement;
[0030] On the upper surface of the floor slab 14, water retaining sills 16 surrounding the outer circumferences of the holes K1 are arranged respectively. Wall 20-30mm;
[0031] Pass each floor-through structure through the floor 14 from its corresponding hole K1; each hole K1 is larger than the corresponding floor-through structure, so th...