Method for towing offshore wind power installation ship based on multi-point mooring positioning system
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- SHANGHAI MERCHANT SHIP DESIGN & RES INST
- Publication Date
- 2020-12-01
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the installation of an offshore wind farm, in particular to a method for towing an offshore wind power installation ship based on a multi-point mooring positioning system. Background technique
[0002] In recent years, the newly installed capacity of offshore wind power in the world has maintained an average annual growth rate of about 12%, and the cumulative installed capacity is expected to increase from 8770MW in 2014 to 57980MW in 2024. At present, my country is the fourth largest offshore wind power country in the world, accounting for 8.4% of the global offshore wind power market share. Offshore wind turbine foundations and technologies such as wind turbine installation and maintenance require professional offshore wind power installation ships. At present, the installation of offshore wind turbine foundation mainly has two forms: (1) floating crane + guide frame; (2) self-elevating platform + special pile holder. Throug...