A construction method for fixing steel inner molds at horizontal construction joints of pipe gallery

A technology of horizontal construction joints and construction methods, which is applied in water conservancy projects, artificial islands, underwater structures, etc., can solve the problems of large one-time investment of formwork, inability to carry out turnover, expansion of formwork, slipping, misplacement and other problems. Achieve the effect of ensuring the thickness of the protective layer of the steel bar, strengthening the waterproof effect of the structure, and protecting the deformation of the steel bar

Active Publication Date: 2020-10-23
CHINA MCC17 GRP
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] As we all know, the main body of the underground pipe gallery cannot be formed at one time, so a horizontal construction joint will be left on the side wall of the pipe gallery. The general position is basically close to the bottom surface of 150mm-300mm. In order to ensure the waterproof effect of the pipe gallery, it will be constructed horizontally along the pipe gallery Install water-stop steel plates at the joints and add a waterproof reinforcement layer after the main body is formed. If the horizontal construction joints are not handled properly, there will be mold expansion, flow, and misplacement during the construction of the upper wall, which will affect the construction quality of the concrete. and the normal operation of subsequent processes
The previous practice was to remove the formwork after the construction of the lower concrete wall, and support the upper wall formwork according to the conventional method. The horizontal construction joints were not reinforced firmly, which caused the above problems, or the lower wall formwork was not removed, and the upper formwork was continued. Installation and construction, such a one-time investment in formwork is large, and turnover cannot be carried out

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method for fixing steel inner molds at horizontal construction joints of pipe gallery
  • A construction method for fixing steel inner molds at horizontal construction joints of pipe gallery

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0015] In order to further describe the method for fixing the steel inner form of the pipe gallery horizontal construction joint of the present invention, it will be further described below with reference to the accompanying drawings.

[0016] Figure 1-2 Middle: A method for fixing a steel inner mold for horizontal construction of a pipe gallery, comprising a bottom plate 1, a steel inner mold fixing device 3, and a steel inner mold 5. The bottom plate 1 is pre-embedded with pre-embedded reinforcing steel heads 2, and the steel inner mold The fixing device 3 is welded to the embedded rebar head 2, the steel inner mold fixing device 3 is welded with a fixing rod 4, the upper end of the fixing rod 4 is provided with a thread, and the fixing rod 4 is threaded with two iron plates. The iron sheet clamps and fixes the steel inner mold 5. The construction method includes the following steps:

[0017] 1). Construction preparation, prefabricated and processed the steel inner mold fixing ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the field of building construction, and particularly relates to a pipe gallery horizontal construction seam steel inner formwork fixing construction method. A bottom plate, asteel inner formwork fixing device and a steel inner formwork are included, a pre-buried steel bar head is pre-buried in the bottom plate when a bottom plate waterproof protection layer is poured, after bottom plate bottom bars are bound, the steel inner formwork fixing device is welded to the pre-buried steel bar head, a fixing rod is welded to the steel inner formwork fixing device, a thread isarranged at the upper end of the fixing rod, and the fixing rod is in threaded connection with two iron sheets; after the bottom plate and wall steel bars are bound, the steel inner formwork is hoisted onto the iron sheets of the steel inner formwork fixing device to be fixed, after the bottom edge of the steel inner formwork is placed on the lower iron sheet, the upper iron sheet is screwed, andthus the steel inner formwork is stable and reliable; and the steel bars can be effectively protected against deforming, the thickness of a steel bar protection layer can be effectively guaranteed, use of split bolts is further avoided, and the structure waterproof effect is reinforced while the concrete impression is improved.

Description

Technical field [0001] The invention belongs to the field of building construction, and specifically relates to a method for fixing a steel inner mold for horizontal construction of a pipe gallery Background technique [0002] It is well known that the main body of the underground pipe gallery cannot be formed at one time, so a horizontal construction joint will be left on the side wall of the pipe gallery. The approximate position is basically close to 150mm-300mm of the floor surface. To ensure the waterproof effect of the pipe gallery, the construction will be horizontally constructed along the pipe gallery. Install water-stop steel plates at the joints and add a waterproof reinforcement layer after the main body is formed. If the horizontal construction joints are improperly handled, during the construction of the upper wall, there will be phenomena such as expansion, flow, and dislocation, which will affect the quality of concrete construction And the normal process of subse...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D29/16E02D29/045
CPCE02D29/10E02D29/16
Inventor 徐小钦贺英峰
Owner CHINA MCC17 GRP