Transformation method of single-bus operating transformer station
A technology of single busbar and substation, applied in switchgear, electrical components, etc., can solve the problems of long cycle, high cost of substation, waste of resources, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0044] The specific implementation of the method for transforming a single-bus operating transformer station of the present invention will be described in detail below in conjunction with the accompanying drawings.
[0045] See attached figure 1 , 2 , during transformation, move the load of No. 2 main transformer to No. 1 main transformer; disconnect the circuit breaker between No. The bus isolating switch corresponding to the section of the transformer, disconnect the incoming circuit breaker of the No. Double-bus related equipment, all tests are qualified; connect No. 2 main transformer equipment, connect No. 2 main transformer to No. The transformer interval equipment is energized; check the phases of the high and low voltage sides of the No. 2 main transformer and the No. 1 main transformer, and confirm that the phase is normal; move the load of the No. 1 main transformer to the No. 2 main transformer.
[0046] The double-dot dash line in the figure is the power-off int...