Construction progress resource automatic optimization method based on building information model
A building information model and construction schedule technology, applied in the field of resource optimization, can solve problems such as low efficiency, incomplete RCPSP model, and incomplete consideration of seven types of information in construction resource optimization
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0160] 1) Data preparation
[0161] Using data preparation methods, the associated work package templates were created. Considering the difference of construction resources, the cast-in-place concrete construction operation is decomposed into three work package templates: formwork engineering, steel reinforcement engineering and concrete engineering. At the same time, a work package formwork was created for the precast concrete walls and the precast concrete slabs respectively. Therefore, there are a total of 8 work package templates for test verification. Each work package template is composed of four parts, which are basic information, classification, process flow and resource. Among them, the classification and resource part are related to the information integration process. Currently there is only one building element code in the taxonomy, which is used for the first match in the core model integration process. The resource part includes several quotas, and each quota...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com