A method for simulating water discharge from a hydrological model reservoir
A technology of hydrological model and simulation method, applied in the direction of hydraulic model and so on
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0042] Such as figure 1 As shown, the embodiment of the present invention provides a method for simulating the discharge of a hydrological model reservoir, comprising the following steps:
[0043]S1. According to the reservoir design documents or actual operation reports, etc., collect basic information of the reservoir, mainly including five water level storage capacity information (total storage capacity, design flood level storage capacity, normal water level storage capacity, flood control limited water level storage capacity, dead storage capacity), 3 Maximum discharge of a control water level (maximum discharge below the check flood level, maximum discharge below the design flood level, maximum discharge below the normal water storage level), 2 monthly average discharges (power generation discharge, minimum ecological flow) , and economic and social water withdrawals;
[0044] S2, use the model to simulate the reservoir inflow and reservoir evaporation in the current pe...
Embodiment 2
[0052] This embodiment is based on the method in embodiment 1, and the method is embedded in the hydrological model to realize the simulation of the reservoir regulation and discharge process.
[0053] This embodiment mainly lists the simulation flowchart of the reservoir dispatching and discharging process, such as Figure 4 As shown, the specific program implementation depends on the language of the embedded model. where the unit of V is m 3 , the unit of Q is m 3 / s, the unit of T is s, the value is the number of seconds in the basic time unit of the model, which is used to calculate the conversion of flow and volume within a period, for example, T=86400s in daily simulation.
[0054] First, the hydrological model needs to be used to calculate the inflow of the river, the evaporation of the reservoir, and the economic and social water intake in the current period, and the initial reservoir capacity V0 of the current period is obtained by accumulating the reservoir capacit...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


