Vertical expanding construction method and structure of underground space

An underground structure and underground space technology, which is applied to underwater structures, building structures, infrastructure projects, etc., can solve the problems of long construction period, loss of use function, and high construction risk, and achieves low construction cost and increased construction costs. The effect of underground facility space

Inactive Publication Date: 2019-12-27
SHANGHAI CONSTRUCTION GROUP
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The cost of demolition and reconstruction is high, the construction period is long, and the original function of use is lost during the reconstruction stage
Regardless of whether the horizontal extension is adopted by open-cut or underground-excavation methods, it is technically difficult to deal with the connection between the existing structure and the extended structure, and the construction risk is high.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Vertical expanding construction method and structure of underground space
  • Vertical expanding construction method and structure of underground space
  • Vertical expanding construction method and structure of underground space

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0039] see Figure 1 to Figure 8 , this embodiment discloses a construction method for vertical expansion of underground space, which is used for vertical expansion of the original underground structure, including:

[0040] Step one, such as figure 1 As shown, the rotary grouting method is used to carry out rotary grouting reinforcement from the bottom plate 1 of the original underground structure to the area where the extension structure is located, forming a reinforced soil body 3, so that the reinforced soil body 3 and the original enclosure 5 of the original underground structure are closely connected , can improve the safety and stability of the extension structure construction. Preferably, in this embodiment, the reinforcement method of the reinforced soil 3 is full reinforcement, so as to further improve the safety and stability of the extension structure construction.

[0041] Step two, such as figure 2 and image 3As shown, the bottom plate 1 of the original unde...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a vertical expanding construction method and structure of an underground space. A reinforcing soil body is arranged in an expansion area, namely below a to-be-expanded structure, and is tightly connected with an original enclosure of an original underground structure, a new enclosure is arranged on the inner side of the original enclosure, grout is injected into a gap between the new enclosure and the original enclosure to form an enclosure combination, a locking beam is arranged at the top of the combination of the new enclosure and the original enclosure, and a new stand column extends downwards to a position below the reinforcing soil body and extends upwards to a roof of the original underground structure, so that the new enclosure and the original enclosure arestably supported, the whole construction process is completed in the original underground structure and an expanded structure, vertical expanding construction can be achieved without affecting the service function of an existing building, an underground facility space is enlarged under the condition that the influence on the environment is minimized, and the increasing usage requirements of residents are met. In addition, the original enclosure and an original structural beam plate can be used repeatedly to the maximum extent, so that the expanding construction cost is low.

Description

technical field [0001] The invention relates to the field of underground space construction, in particular to a construction method and structure for vertical extension of an underground space. Background technique [0002] With the increasing population of central cities, ground buildings are far from meeting the daily needs of residents, and commercial, civil and municipal facilities such as shopping malls and subway stations are gradually developing deeper underground. However, due to factors such as the estimated flow of people and capital costs, the underground building space is often not considered for subsequent use during the initial construction, and the space design is too small to meet the use needs after many years. [0003] There are two common solutions, one is demolition and reconstruction, and the other is horizontal expansion. The cost of demolition and reconstruction is high, the construction period is long, and the original function of use is lost during ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline