Active stress eliminating device for tunnel construction and active stress eliminating method
A technology of active stress and tunnel construction, which is applied in tunnels, tunnel linings, shaft equipment, etc., can solve the problems of loose sand and pebble structures and a large number of potholes, and achieve the effect of increasing friction and reducing working hours
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention.
[0038] see Figure 1-6 , the present invention provides a technical solution: an active stress relief device for the construction of loose sand and pebble geological tunnels, comprising a stilling arch 1, two ends of the stilling arch 1 are respectively welded with two upper positioning feet 2 On the surface, the stilling arch 1 is provided with joints 3 arranged around the center of the stilling arch 1. The joints 3 are used to connect adjacent stilling arches 1, and the stilling arch 1 is provided with Anchor hole 4, anchor hole 4 is used for the anchor rod to realize the positioning between the stilling arch 1 and the inner wall of the tunnel, which belongs to the w...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com