Underground continuous wall construction method
An underground diaphragm wall and construction method technology, applied in the field of foundation engineering, can solve the problems of difficult jacking, solidification of joint boxes, large contact area, etc., and achieve the effect of ensuring the reserved length
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0022] A method for constructing an underground diaphragm wall, comprising the steps of:
[0023] Step 1, construction preparation, site cleaning, setting-out measurement, construction guide wall, prefabricated mud. When measuring and setting out, according to the base point, guide point and benchmarking point provided by the owner, the construction surveying control points and benchmarking points are arranged in the construction site. After the supervisory unit checks and accepts them correctly, the centerline of the underground diaphragm wall is positioned and staked out. During the construction process, the foundation point pile position is often retested.
[0024] When making the guide wall in step 1, the guide wall adopts an integral reinforced concrete structure, the net width is 5cm thicker than the underground continuous wall, the top of the guide wall is flat with the ground, the guide wall must be inserted into the original soil, and the top surface of the guide wall...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com