The method of preventing the existing tunnel from floating up during the unloading of earthwork directly above it

An existing tunnel, directly above technology, applied in infrastructure engineering, construction, sheet pile walls, etc., can solve problems such as floating of existing tunnels, and achieve the effects of strengthening soil, improving stability, and simple construction methods.

Active Publication Date: 2021-09-10
ANHUI URBAN CONSTR DESIGN & RES INST
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0007] The purpose of the present invention is to overcome the deficiencies of the prior art, and provide a method for preventing the existing tunnel from floating up during unloading of earth directly above it, so as to solve the problem of unloading the soil on the surface or excavating the foundation pit in the prior art. There are technical issues with the tunnel going up

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • The method of preventing the existing tunnel from floating up during the unloading of earthwork directly above it
  • The method of preventing the existing tunnel from floating up during the unloading of earthwork directly above it
  • The method of preventing the existing tunnel from floating up during the unloading of earthwork directly above it

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0033] In this embodiment, a method for preventing the existing tunnel from floating up during unloading of earthwork directly above it is provided.

[0034] This embodiment is aimed at removing the soil mound on the surface directly above the tunnel to avoid weathering of the soil mound and raising dust, and at the same time construct other buildings on the surface to beautify the urban environment.

[0035] The method includes the following steps:

[0036] Step 1. Determine the range and depth of earthwork that needs to be unloaded right above the existing tunnel;

[0037] In this embodiment, first confirm the range and thickness of the earthwork directly above the tunnel in the mound, that is, confirm the range that can affect the uplift of the tunnel;

[0038] Step 2, divide the earthwork that needs to be unloaded into multiple unloading layers from top to bottom;

[0039] In this embodiment, after confirming the scope of the soil mound that can affect the floating of th...

Embodiment 2

[0051] This embodiment is aimed at excavating the foundation pit downwards at the surface directly above the existing tunnel, and constructing the corresponding buildings, that is, the soil with a certain thickness between the surface and the existing tunnel is removed, and then the existing There is a certain amount of unloading in the tunnel. Therefore, in order to prevent the existing tunnel from floating up during the unloading process, this embodiment is implemented according to the following method.

[0052] The method includes the following steps:

[0053] Step 1. Determine the range and depth of earthwork that needs to be unloaded right above the existing tunnel;

[0054]In this embodiment, first confirm the range and thickness of the earthwork directly above the tunnel in the foundation pit, that is, confirm the range that can affect the buoyancy of the tunnel;

[0055] Step 2, divide the earthwork that needs to be unloaded into multiple unloading layers from top to ...

Embodiment 3

[0068] In this embodiment, the construction object is a combination of the earthwork on the corresponding surface directly above the existing tunnel and the earthwork corresponding to the excavation of the foundation pit directly above the existing tunnel.

[0069] The construction method is the combination of Embodiments 1 and 2, that is, the processed soil is the earthwork corresponding to the earthwork on the surface and the foundation pit, and the rest are the same.

[0070] Further, in Examples 1-3, in order to save the material of steel pipe piles and reduce the damage to the original soil, the steel pipe piles are specifically composed of steel pipes of two lengths, and the two kinds of steel pipes are pressed at intervals. into the corresponding unloading layer.

[0071] Through the above-mentioned arrangement, the steel pipe piles are arranged in a staggered manner, and while saving costs, the soil body can be effectively reinforced to prevent the above and further pr...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for preventing an existing tunnel from floating up in the process of unloading earthwork directly above it, and relates to a foundation pit construction method, which includes determining the range and depth of earthwork to be unloaded directly above the existing tunnel, and The unloaded earthwork is divided into multiple unloading layers from top to bottom, and steel pipe piles are evenly constructed on the top unloading layer to prevent floating and deformation of the corresponding unloading layer, and the horizontal plane of the top of each steel pipe pile is the same as the corresponding unloading layer. The horizontal plane of the top of the layer is equal, and multiple unloading layers are excavated sequentially from top to bottom. During the excavation, the exposed steel pipe piles are pressed down so that the top is equal to the top of the unloading layer to be excavated in the lower layer, and the excavation continues until all steel pipe piles The top of the pile is equal to the bottom of the earthwork to be unloaded, and the bottom of the steel pipe pile directly above the existing tunnel is kept at a safe distance from the top of the existing tunnel. The method provided by the invention can effectively prevent the disadvantage of the existing tunnel floating up during unloading, and the operation is simple.

Description

technical field [0001] The invention relates to a foundation pit excavation method, in particular to a method capable of preventing the tunnel from floating up when the unloading operation is performed above the existing tunnel. Background technique [0002] The subway is the main way of public transportation in major cities now, and it has many advantages such as high stability, punctuality, and safety. The tunnel is the life channel for the subway to transport passengers quickly. [0003] The construction and later maintenance of tunnels require a lot of manpower and material resources. Tunnel floating is a common problem in its construction process. Therefore, the influencing factors will be fully considered during the construction process to avoid various problems caused by floating after the completion of later construction. [0004] Therefore, after the completion of the tunnel construction, the factors affecting the uplift of the tunnel are basically resolved, and t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D31/12E02D27/26E02D5/28
CPCE02D5/285E02D27/26E02D31/12
Inventor 束冬青蔡敏孟玉单灿灿张龙飞李慧明王宗德高程东孙昌兴郑永磊
Owner ANHUI URBAN CONSTR DESIGN & RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products