Embodiment 1
[0116] Take shield machine host 8, equipment bridge 9, and 1# trailer 10 as an example with a total length of about 85m and a fixed excavation distance of 100m.
[0117] ⅰ. The main structure of the station where the layout starts
[0118] Restricted by the construction length limit of the main structure of the station, the shield tunneling is carried out in a separate launching method. The opening door of the launching shaft is 15 distances from the excavation opening, and the shield machine main engine 8, the equipment bridge 9 and the 1# trailer 10 can be placed. , place 2# trailer 11, 3# trailer 12, 4# trailer 13, and 5# trailer 14 in the space near the side wall, connect 1# trailer 10 with 2# trailer 11 through the extension pipeline 39, and connect 6# trailer 17 is placed on the ground and will not be used temporarily. After 100m of excavation is completed, remove the negative ring, transfer 2# trailer 11, 3# trailer 12, 4# trailer 13, and 5# trailer 14 to the axis of sh...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com