Synchronous construction method of open hard rock roadheader and secondary lining
A technology of hard rock roadheader and secondary lining, applied in wellbore lining, tunnel lining, earthwork drilling, etc., can solve the problems of tight construction period, harsh natural conditions, long distance of raw material transportation, etc., to relieve construction period pressure and completion time. early effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0012] Example 1: Simultaneously with the TBM excavation, the secondary lining of the tunnel is carried out synchronously. The implementation method is to start the secondary lining construction when the TBM excavation is about 1000m long, and use three sets of transport trains to marshal the TBM excavation within the length of 0-6km, and then add 3km for each additional 3km. For one formation, 5 trains are used at most, and one train is used as a backup; two 16.5m formwork trolleys are used for the secondary lining, and the distance between the two trolleys is about 500m. Waterproof board laying platform and repair frame; second lining concrete pouring prepares two marshalling cars for supplying concrete, and prepares another motorized train, a total of five trains.
[0013] Secondary lining power consumption plan: Install a "T" joint every 800m on the 10,000-volt main cable entering the hole, and install a cable reel on the lining repair trolley to ensure that the power suppl...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com