Partial pool wall reconstruction dry construction recyclable device under the pool full of water operating conditions
A technology of dry operation and pool wall, which is applied in the direction of building structure, construction, building maintenance, etc., can solve the problems of difficult outage coordination, large influence of operating flow rate, and high construction risk of underwater operation, so as to reduce the risk of underwater operation , High degree of mechanized operation, with the effect of small workload
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0026] Such as figure 1 , as shown in 2, a recyclable device for partial pool wall renovation and dry construction under the operating condition of a pool full of water, including an open arc-shaped steel box 1, a top pushable elongated rigid connecting rod 2, and an arc-shaped water stop 3 , a small groove embedded in the extremity strip airbag 4, underwater concrete between the large groove at the extremity and the pool wall 5, underwater concrete 6 in the half-well space, and sand bags 7 thrown underwater on the outer arc side of the bottom.
[0027] The open curved steel box 1 is filled with sandbags 7 through the outer arc side of the bottom, and the top can push and extend the rigid connecting rod 2 to weld with the embedded parts of the pool wall, so that the open curved steel box 1 can be connected with the pool wall water. Laying under the wat...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

