Monitoring method and barrier for ecological water source disturbance caused by overlying strata mining separation layer expansion
A delamination and ecological technology, which is applied in the direction of fluid pressure measurement, measurement, and instruments using optical methods, can solve the problems of inability to realize ecological direct water supply and reserve water source disturbance monitoring, and simultaneous monitoring, so as to eliminate ground temperature interference, The effect of low cost and accurate test results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0061] A specific embodiment of the present invention discloses a method for monitoring ecological water level changes caused by overburden mining and separation layer expansion. figure 1 A flow chart of the monitoring method is shown, specifically including the following steps:
[0062] S1. Determine the lithology and vertical structure characteristics of the overlying strata on the coal mining face.
[0063] The lithology and vertical structure characteristics of the overlying strata on the coal mining face are determined according to the methods of ground drilling coring, borehole TV imaging or drilling test curves. Layer expansion area. During the mining process of the coal seam, the overlying strata on the coal mining face form water-conducting fracture areas and separation layer expansion areas from bottom to top. In this step, it is necessary to determine the stratum lithology, the thickness of different lithology strata, and the water-conducting fracture areas and sep...
Embodiment 2
[0123] Yet another embodiment of the present invention differs from Embodiment 1 in that in step S4, after the installation of the osmotic pressure sensor is completed, the method of setting a barrier between the monitored aquifer and the non-aquifer is different. This embodiment uses a barrier Block hydraulic connections between monitored aquifers.
[0124]Use barriers to separate different monitoring aquifers. The layout of the barriers includes the following methods: The first layout method is to set up two barriers for each layer of monitoring aquifers. The blocker is arranged in the center of the underlying rock layer, or the blocker is arranged at the lower part of the overlying rock layer of the monitoring aquifer and the upper part of the underlying rock layer, and the blocker does not hinder the water flow within the height range of the aquifer; the second arrangement Each layer of monitoring aquifer is equipped with a blocker, and the blocker is arranged at the centr...
PUM
Property | Measurement | Unit |
---|---|---|
thickness | aaaaa | aaaaa |
particle diameter | aaaaa | aaaaa |
particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com