A method for initializing and verifying the existing control state after restarting the interlocking equipment
A technology of interlocking equipment and control status, which is applied in the direction of transportation center control system, railway signal and safety, railway traffic management, etc., which can solve the problem of insecurity, failure to record section speed limit configuration before CI restart, and temporary speed limit verification Problems such as a single plan, to achieve the effect of accurate speed limit information
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] In order to make the purpose, content, and advantages of the present invention clearer, the specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.
[0024] The present invention is a method for initializing and verifying an existing control state after an interlocking device is restarted, comprising:
[0025] The initialization verification process includes:
[0026] The temporary speed limit setting takes the temporary speed limit section as the smallest unit. Only when the CI judges that the command has been verified successfully can the CI accept the TSR to execute the command. When the CI device restarts, if you can read the effective speed limit information stored offline locally, you need to package and send the locally stored speed limit status to ATS, and request to verify the validity of the stored speed limit:
[0027] After the interlock restarts, TSR ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


