Micro-interference post-filling underground excavation connector connecting component and construction method thereof

A technology for connecting components and micro-interference, which is applied in the field of connecting components for backfilling and undercutting interfaces and their construction, and can solve problems such as affecting the normal use of existing structures, being unable to carry out undercut construction, and interfering with the construction of new projects.

Pending Publication Date: 2020-05-29
SHANGHAI URBAN CONSTR DESIGN RES INST GRP CO LTD
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

If the above-mentioned conventional transformation is adopted, there will be a lot of interference. First, it will interfere with the use of the already built structures. For example, whether it is to strengthen or remove the existing structures, it will affect the normal use of the existing structures; second, it will interfere with the new construction. For the construction of the original interface components, the removal and new construction of the original interface components need to be reinforced in advance, which are divided into internal force reinforcement and external foundation reinforcement. The external foundation reinforcement is in conflict with the new excavation structure, and it is impossible to carry out concealed excavation during the reconstruction stage. dig construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Micro-interference post-filling underground excavation connector connecting component and construction method thereof
  • Micro-interference post-filling underground excavation connector connecting component and construction method thereof
  • Micro-interference post-filling underground excavation connector connecting component and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0048] Such as Figure 1 to Figure 7 As shown in Fig. 1 , the subsurface excavation interface of the micro-interference is connected to the components, and the connecting component 1 is connected to the existing underground structure 2.

[0049] The connecting member 1 includes several end beams 11, several end columns 12, several connecting member longitudinal beams 13, several connecting member floors 14 and several connecting member side walls 15;

[0050]Several end beams 11 and several end columns 12 are used to bear the load of the existing underground structure 2;

[0051] A number of connecting member longitudinal beams 13 and a number of connecting member floors 14 form a beam-slab system, and the beam-slab system bears vertical water and / or soil loads and self-weight;

[0052] Several connecting member side walls 15 bear lateral horizontal loads and serve as the fulcrum of the floor slab in the connecting member frame system;

[0053] The steel bars of each connect...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a micro-interference post-filling underground excavation connector connecting component and a construction method thereof. The micro-interference post-filling underground excavation connector connecting component comprises end cross beams, end columns, connecting component longitudinal beams, connecting component floor slabs and connecting component side walls, wherein reinforcing steel bars of the connecting component floor slabs are connected with longitudinal reinforcing steel bars of an existing underground structure and are disconnected at a deformation joint; reinforcing steel bars of the connecting component longitudinal beams are connected with longitudinal reinforcing steel bars of the existing underground structure; newly-built columns are arranged at thejoints of the connecting component side walls and the existing underground structure; and when fender posts at the connecting parts of the existing underground structure and the connecting component are chiseled away, corresponding fender post longitudinal steel bars are reserved, and the fender post longitudinal steel bars are anchored into the corresponding connecting component floor slabs; andduring construction, the existing underground structure is firstly modified in a targeted mode, and then the connecting component longitudinal beams, the connecting component floor slabs and the connecting component side walls are connected with the existing underground structure. According to the micro-interference post-filling underground excavation connector connecting component and the construction method thereof, arrangement of the post-filling underground excavation connector connecting component is completed more economically, reasonably, safely and efficiently.

Description

technical field [0001] The invention relates to the technical field of construction of underground structures, in particular to a micro-interference back-dug interface connection component and a construction method thereof. Background technique [0002] In the field of underground engineering, when the project is implemented in stages, there are interface connection components between the first implementation part and the second implementation part. The function of the interface connection components is to transmit the structural force and seal the interface waterproof. Better interface connection components can ensure the safety of the structure at the interface and meet the requirements for deformation and waterproofing of underground components. When the structure implemented later is constructed by the open cut method, due to the large working surface during construction, the structural components can be processed flexibly, such as reconstruction, expansion or adjustment...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D11/10E21D11/38E21D11/00E21D11/14
CPCE21D11/10E21D11/38E21D11/003E21D11/14
Inventor 黄爱军王春凯齐明山午鹏奇
Owner SHANGHAI URBAN CONSTR DESIGN RES INST GRP CO LTD
Features
  • Generate Ideas
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More