Supercharge Your Innovation With Domain-Expert AI Agents!

Partition wall board installation accessory and installation method

An installation method and a technology of partition boards, which are applied to walls, building components, buildings, etc., can solve problems such as failure to meet technical requirements, and achieve the effects of reducing labor costs, simplifying the installation process, and reducing installation time

Pending Publication Date: 2020-06-02
李崇春
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide a partition board installation accessories and installation method to solve the existing technical defects and technical requirements that cannot be met

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Partition wall board installation accessory and installation method
  • Partition wall board installation accessory and installation method
  • Partition wall board installation accessory and installation method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0029] The steps of the single-sided wall installation method are divided into: S1: Use a level to find out the horizontal and vertical positions of the partition wall and draw the line; S2: Place the main body 1 according to the position of the drawn line and fix it with steel nails so that the steel nails The installation position is in the groove 1 of the main body 1; S3: Put the partition board into the fixed main body 1 in turn, and use the screw 8 to connect the main body 1 with the partition board; S4: Put the main body 2 2 and the main body 1 are connected and fixed with the screw 8, and the main body 2 and the partition wall are connected and fixed with the screw 8; S4: Install the decorative clip 9 into the inside of the groove 2 6 and the groove 3 7.

Embodiment 2

[0031] The steps of the 90-degree corner wall installation method are divided into: S1: Use a spirit level to find out the horizontal and vertical positions of the partition wall and draw lines; 1 at the handover place and cut a 45-degree angle; S3: splicing the two main bodies-1 into a 90-degree corner, and connecting them with connectors to form a whole; S4: placing the whole body of the main body-1 along the drawn line and using steel Fix the nails so that the installation positions of the steel nails are respectively in the grooves 5 of the two main bodies 1; S5: Select two partition boards, put the partition boards into the fixed two main bodies 1 in turn, And use screws 8 to connect and reinforce the main body 1 with the partition board; S6: cut and connect the junction points of the two partition boards with the accessories cutting method and install them into the two main body 1 respectively; S7: select two main body 2 2. Use screws 8 to connect the main body 2 and mai...

Embodiment 3

[0033] The steps of the T-shaped wall installation method are divided into: S1: Use a level to find out the horizontal and vertical positions of the partition wall and draw the line; S2: Select two main bodies-1, and place the two main bodies-1 according to the actual size Cutting, so that the intersection point of the two main bodies-1 is cut into a V shape, and the two main bodies-1 are spliced ​​into a T-shape to form a whole; S3: The whole body formed by splicing the main body-1 is placed along the drawn line Place and fix with steel nails, so that the installation positions of the steel nails are respectively in the grooves of the two main bodies-1-5; S4: Select two partition boards, and put the partition boards into the fixed two main bodies-1 respectively inside, and use screws to connect and reinforce the main body 1 with the partition wall; S5: Select two main bodies 1, connect the main body 2 with the main body 1 respectively with screws, and connect the two main bodi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a partition wall board installation accessory and an installation method. The partition wall board installation accessory includes a first main body and a second main body, thefirst main body includes a first connecting plate and a second connecting plate, a first groove is formed in the upper surface of the second connecting plate, second grooves are formed in the outer side surface of the first connecting plate, third grooves are formed in the outer side surface of the second main body, screws are separately arranged in the second grooves and the third grooves, and decorative clamping strips are arranged on the outer part of the first connecting plate and the outer part of the second main body; and the installation method of the partition wall board installationaccessory includes a single-sided wall body installation method, a 90-degree corner wall body installation method, a T-shaped wall body installation method and a cross-shaped wall body installation method. According to the partition wall board installation accessory and the installation method, the installation process can be simplified, the installation time can be reduced, the installation costcan be reduced, the installation efficiency can be improved, and the manpower expenditure can be reduced; and a partition wall board can be quickly, effectively, simply and conveniently installed, andthe partition wall board can become an accessory reused for multiple times, so that the partition wall board is reused for multiple times to be beneficial to energy conservation and emission reduction.

Description

technical field [0001] The invention relates to the technical field of partition wall panel installation, in particular to a partition wall panel installation accessory and an installation method. Background technique [0002] At present, the known installation accessories for partition walls are formed by one-time extrusion of wood-plastic material, which is an integral structure and cannot be disassembled. However, in field installation, due to its characteristics including integrity and inseparability, the partition wall The panel greatly wastes manpower and material resources in the installation process and increases too much installation time; in order to overcome the shortcomings of the existing partition panel accessories such as complicated installation, inability to use multiple times, and waste of manpower and time, a partition panel is urgently needed Installation accessories and installation methods. Contents of the invention [0003] The object of the present...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04B2/74E04B1/38
CPCE04B1/38E04B2/74
Inventor 李崇春
Owner 李崇春
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More