Method for setting safety early warning threshold value of double-layer lining water delivery tunnel operation structure on soft foundation
A technology for water conveyance tunnels and safety early warning, which is applied in forecasting, alarms, hydropower generation, etc., can solve problems such as failure to meet the safety monitoring requirements of project operation, lack of risk warning thresholds, etc., and achieve the effect of ensuring safe operation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] Hereinafter, the preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings in order to understand the purpose, features and advantages of the present invention more clearly. It should be understood that the embodiments shown in the drawings are not intended to limit the scope of the present invention, but merely to illustrate the essential spirit of the technical solution of the present invention.
[0022] The method for setting the safety early warning threshold of the operating structure of the double-lined water conveyance tunnel on the soft foundation provided by the present invention includes the following steps:
[0023] Step 1: Deploy an interlayer piezometer between the inner and outer linings of the tunnel, and perform statistical regression analysis on the monitoring results of the interlayer piezometer. The statistical regression analysis formula is as follows:
[0024]
[0025] Among them, p(t) represents...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


