Unlock instant, AI-driven research and patent intelligence for your innovation.

Method for reducing inter-well crack interference in fracturing process

A kind of fracturing and fracturing fluid technology, which is applied in the direction of earthwork drilling, wellbore/well components, production fluid, etc. It can solve the problems of interference between wells, low reservoir recovery rate, poor control of fracturing scale, etc., and achieve The effect of increasing oil and gas production

Active Publication Date: 2020-06-12
BC P INC CHINA NAT PETROLEUM CORP +1
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the limited knowledge of formation parameters in the former method, the simulation calculation results are very different from the actual situation; the latter method is difficult to control the scale of fracturing, and if the estimate is too high, it may lead to interwell interference. If the estimate is too low, it may lead to the failure of some formations to be stimulated, resulting in a low recovery rate of the reservoir

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for reducing inter-well crack interference in fracturing process

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] Hereinafter, the method for reducing interwell fracture interference in the fracturing process of the present invention will be described in detail with reference to the accompanying drawings and exemplary embodiments.

[0018] figure 1 A schematic process flow diagram of an exemplary embodiment of the method for reducing interwell fracture interference during fracturing according to the present invention is shown.

[0019] Such as figure 1 As shown in, in an exemplary embodiment of the present invention, the method for reducing interwell fracture interference during fracturing is aimed at porosity less than 6% and matrix permeability less than 10 -4 For mD reservoirs, during the fracturing and pumping process of oil and gas drilling, the steps of temporary plugging, temporary plugging effect monitoring and microseismic monitoring are adopted. Specifically, the method for reducing interwell fracture interference in the fracturing process adopts the steps of temporary ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a method for reducing inter-well crack interference in the fracturing process. The method is suitable for a reservoir of which the porosity is smaller than 6% and the matrix permeability is smaller than 10<-4> mD and comprises the steps of temporary blocking, temporary blocking effect monitoring and microseismic monitoring in the drilling fracturing pumping process. The temporary blocking step comprises the substeps that 500-2,000 kg of solid particulates with the particle size of 109-212 micrometers, 70-120 kg of a temporary blocking agent with the particle size of 380-830 micrometers and 5-10 m<3> of fracturing liquid are mixed to form mixed liquid, the mixed liquid is pumped, and the displacement is controlled to be 10-15 m<3> / min. The temporary blocking effect monitoring step comprises the substeps that after the mixed liquid is pumped, slickwater is pumped, and it is judged that temporary blocking is achieved when it is monitored that the pressure at the wellhead generates positive pulse larger than 2 MPa. The microseismic monitoring step comprises the substeps that after it is judged that temporary blocking is achieved, whether crack steering is achieved or not is judged according to the trend of microseismic monitoring responding event points. The method has the advantages that hydraulic crack steering can be achieved, the reservoir recovery ratiocan be increased, and inter-well interference can be reduced.

Description

technical field [0001] The invention belongs to the technical field of oil and gas exploitation, and specifically relates to a method for reducing interwell fracture interference during fracturing. Background technique [0002] In order to meet the "factory" operation mode, the current shale gas development is generally developed in the platform mode, with an average of 6 to 8 wells per platform. This results in a very small well spacing, an average of only 200 to 300 meters. Therefore, interference between wells often occurs during fracturing operations, which seriously affects later production. [0003] In order to solve this problem, the following methods are usually used at present: 1. Perform fracturing simulation calculation in advance to predict the direction of fractures, as shown in CN201811536687.5, CN201611020378.3, etc.; 2. Control the scale of fracturing. Due to the limited knowledge of formation parameters in the former method, the simulation calculation resul...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21B43/26E21B49/00
CPCE21B43/26E21B43/261E21B49/00
Inventor 曾凌翔石磊钟兴久郑云川
Owner BC P INC CHINA NAT PETROLEUM CORP