Elevator up-direction overspeed test method
A test method and elevator operation technology, which is applied in elevators, transportation and packaging, etc., can solve the problems of long test time, high test requirements, inconvenient elevator overspeed test, etc., and achieve the effect of small test limitation and convenient test
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] Embodiment one: if figure 1 As shown, it is only one of the embodiments of the present invention, a kind of elevator upward overspeed testing method, comprising the following steps:
[0033] S1: Run the elevator to the ground floor;
[0034] In order to enable the elevator to perform the upward test better, it is necessary to ensure that the elevator runs to the ground floor before the upward test can be performed, more space is reserved, and the test accuracy is higher.
[0035] Of course, for the sake of safety, the elevator runs to the ground floor. Before starting the upward overspeed test mode, it is necessary to confirm that the car is empty, the car door and hall door lock circuit are closed, the safety circuit is closed, and the leveling signal and door area signal are normal.
[0036] S2: Set the test parameters and enter the test mode;
[0037] Directly input command parameters in the elevator control system to enter the uplink overspeed test mode.
[0038]...
Embodiment 2
[0053] Embodiment two: still as figure 1As shown, it is only one of the embodiments of the present invention, an elevator upward overspeed test method, in order to facilitate the operator to test and the safety of the test, before starting the upward overspeed test mode, it is necessary to confirm the empty car. The lock circuit of the car, car door and hall door is closed, the safety circuit is closed, the leveling signal and the door area signal are normal, generally speaking, the operator first runs the elevator to the bottom floor, makes the car empty, and closes the car door After confirming that the safety circuit indicator light is on, the leveling signal light and the door area signal light are on, and the car door and hall door closed indicator lights are on, the uplink overspeed test mode can be started. Correspondingly, before step S6 is executed, that is, before exiting the uplink overspeed test mode, the safety loop needs to be disconnected.
[0054] Also, when s...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
