Unlock instant, AI-driven research and patent intelligence for your innovation.

A BIM-based dynamic comprehensive optimization system and method for resource management

A resource management and resource optimization technology, applied in the field of BIM-based resource management dynamic comprehensive optimization system, can solve problems such as unscientific project resource allocation, project quality decline, and project cost increase.

Active Publication Date: 2021-02-02
广州高新工程顾问有限公司
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, my country's construction project management is still in a rough and crazy project management mode, which has led to a series of problems such as irregular project resource management, unscientific project resource allocation, poor project resource collaborative management ability, and lack of comprehensive dynamic management of project resource schedule and cost. Therefore, how to use the accurate project resource data provided by the BIM model as the basis, combined with the adaptive genetic algorithm to analyze the construction project The scientific optimization of project resources and the organic integration of BIM technology and resource optimization management technology are currently technical problems that need to be solved urgently

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A BIM-based dynamic comprehensive optimization system and method for resource management
  • A BIM-based dynamic comprehensive optimization system and method for resource management
  • A BIM-based dynamic comprehensive optimization system and method for resource management

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0066] The present invention is further described in conjunction with the following examples.

[0067] figure 1 A BIM-based resource management dynamic comprehensive management system is shown, the system includes: 3D BIM model building module 100, project information acquisition module 200, project resource data management module 300, engineering cost data management module 400, 5D BIM model construction module 500 , resource optimization management module 600 and visual presentation module 700 .

[0068] Wherein, the 3D BIM model construction module 100 is used to construct a 3DBIM model of an engineering project through BIM modeling software; the 3D BIM model includes: attribute information of each component of the engineering project and spatial information between components; Component attribute information refers to: component name, component type, component size, component height, component material, component physical parameters, etc. Through the 3D BIM model of the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a BIM-based resource management dynamic comprehensive optimization system and method. The system comprises a 3D BIM model construction module, a project information acquisitionmodule, a project resource data management module, a project cost data management module, a 5D BIM model construction module, a resource optimization management module and a visual display module. Through the system, the resource consumption condition required by project implementation and the use condition of the cost of the engineering project in the implementation process can be conveniently known, so that the accurate and real-time control on the cost is truly realized. And then, various information of the engineering project is associated, and comprehensive management and dynamic optimization of the progress, the cost and the resources of the engineering project by utilizing the 5D BIM model are realized.

Description

technical field [0001] The invention relates to the technical field of engineering construction resource management, in particular to a BIM-based dynamic comprehensive optimization system and method for resource management. Background technique [0002] Due to the rapid development of my country's construction industry, the scale of engineering construction is constantly increasing, which makes the investment of various resources in the implementation process of engineering construction projects more and more. The important link appears to have a very important key role. At present, my country's construction project management is still in a rough and crazy project management mode, which has led to a series of problems such as irregular project resource management, unscientific project resource allocation, poor project resource collaborative management ability, and lack of comprehensive dynamic management of project resource schedule and cost. Therefore, how to use the accurat...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q10/10G06Q50/08
CPCG06Q10/04G06Q10/0631G06Q10/103G06Q50/08
Inventor 范良宜杨大田杨钰树杨道欣秦至红叶予
Owner 广州高新工程顾问有限公司