Climbing type construction operation platform outside building
A technology for operating platforms and buildings, which is applied in the direction of building construction, construction, and housing structure support, and can solve problems such as inability to climb, simple structure, etc., and achieve the effect of improving lifting capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] see Figure 1~5 , in an embodiment of the present invention, a building external climbing construction operation platform includes an operating platform 1 and a lifting platform 2; the lifting platform 2 is fixedly installed on the side of the operating platform 1, and the upper and lower sides of the lifting platform 2 Two installation frames 6 are symmetrically arranged, and a first screw rod 5 is installed in rotation between the two installation frames 6, and a first screw sleeve 8 is threaded on the first screw rod 5, and the first screw sleeve 8 is rotationally connected with the lifting platform 2, Fix the first screw sleeve 8 on the lifting platform 2, and drive the lifting platform 2 and the operating platform 1 to move up and down by rotating the first screw rod 5, so that the operating platform 1 climbs outside the building; A guide rod 10 is installed, and the lifting platform 2 is slidably connected with the guide rod 10;
[0028] Specifically, in this emb...
Embodiment 2
[0035] see Figure 1~5 , in an embodiment of the present invention, a building external climbing construction operation platform includes an operating platform 1 and a lifting platform 2; the lifting platform 2 is fixedly installed on the side of the operating platform 1, and the upper and lower sides of the lifting platform 2 Two installation frames 6 are symmetrically arranged, and a first screw rod 5 is installed in rotation between the two installation frames 6, and a first screw sleeve 8 is threaded on the first screw rod 5, and the first screw sleeve 8 is rotationally connected with the lifting platform 2, Fix the first screw sleeve 8 on the lifting platform 2, and drive the lifting platform 2 and the operating platform 1 to move up and down by rotating the first screw rod 5, so that the operating platform 1 climbs outside the building; A guide rod 10 is installed, and the lifting platform 2 is slidably connected with the guide rod 10;
[0036] Specifically, in this emb...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


