A technology for industrial workshops and scaffolding, which is applied to the accessories of scaffolding, building structure support, building structure support, etc. It can solve the problems of large column network design size, high structural headroom, and difficulty in ensuring complete alignment of steel pipes, etc., to achieve improved alignment effect, the effect of improving stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] like figure 1 , figure 2As shown, it is a wall-connecting device for scaffolding on the exterior wall of an industrial plant disclosed by the present invention, including three sets of pre-buried parts 1 embedded in the wall and connected to one end of the pre-buried part 1 outside the wall. The connecting part 2 and the connection between the three groups of embedded parts 1 form an equilateral triangle, so as to facilitate the stability of the connection of the embedded part 1 inside the wall. The embedded part 1 is composed of the embedded rod 11 and the embedded casing 12 components, the pre-embedded rod 11 is vertically arranged in the wall, the end of the pre-embedded rod 11 close to the outside of the wall is provided with an external thread, the inner wall of the pre-embedded casing 12 is provided with an internal thread and threaded on the pre-embedded rod 11 Above, the connecting part 2 includes a connecting pipe 21, and one end of the connecting pipe 21 is ...
Embodiment 2
[0051] The present invention also provides a method for using a wall-connecting device for scaffolding on the exterior wall of an industrial plant, comprising the following steps:
[0052] S1: Thread the pre-embedded rod 11 into the pre-embedded sleeve 12, then install the pre-embedded rod 11 and the pre-embedded sleeve 12 in the external wall formwork and pour concrete into the external wall formwork to realize the position of the pre-embedded part 1 fixed;
[0053] S2: Align the positioning bolt 23 on the connecting plate 22 with the internal thread on the embedded casing 12 and insert it into the embedded casing 12 to fix the position of the connecting plate 22 on the wall;
[0054] S3: adjust the position of the right-angle fastener 42 on the fastening pipe 41, so that the position of the right-angle fastener 42 in the length direction of the fastening pipe 41 is aligned with the position of the 21 pipes to be connected on the scaffold;
[0055] S4: Adjust the position of...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com