Engineering project cost data management system and method

A data management system and engineering project technology, applied in the field of engineering project cost data management system, to achieve the effect of simple and rapid operation and reduce the time spent

Active Publication Date: 2020-10-02
北京兴中海建工程造价咨询有限公司
View PDF5 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The existing technical solutions mentioned above have the following defects: project cost management is not only to manage data such as contracts, but also needs to include on-site project implementation modules, and many During the construction process of the enterprise, there are sites that cut corners and materials. Whether the material information on the construction site is fully used in the project needs to be investigated. Therefore, how to check whether there are sites that cut corners and materials based on materials is a technical problem to be solved.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering project cost data management system and method
  • Engineering project cost data management system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0034] refer to figure 1 , is a project cost data management system disclosed by the present invention, including a budget information module, a modeling module, a review module, an information recording module, and a selection module; the budget information module is a group of databases, and this module stores all project materials Budget information, material budget information mainly includes types and quantities. Since there will be losses during the construction process, the actual consumption should be less than the quantity of outbound materials; therefore, actual materials used = (1-5%) * outbound materials, of which 5% is Material loss, the loss of general engineering projects is controlled between 1% and 5%.

[0035] The modeling module includes modeling subunits, node storage units and traceability subunits; the modeling subunits establish virtual three-dimensional models based on construction methods, and engineering projects have a specific construction sequence ...

Embodiment 2

[0040] refer to figure 2 , is a kind of engineering project cost data management method disclosed by the present invention, comprising the following steps:

[0041] (1) Establish a material database for each sub-project based on the finished product of the project, and establish a separate database for each project to store material information;

[0042] (2) Establish a simulated real-time three-dimensional model of the engineering project in combination with the construction method and record the material consumption information of each node in the process of building the three-dimensional model in real time;

[0043] (3) Select the corresponding material usage information based on any group of nodes, and determine its corresponding simulated real-time three-dimensional model based on the material usage information;

[0044] (4) Collect the image information of the engineering project on the spot, and fuzzily compare the simulated real-time three-dimensional model. When the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an engineering project cost data management system, which comprises a budget information module for calculating material information of each sub-part of an engineering projectbased on a finished product; the modeling module is used for establishing an engineering project real-time three-dimensional model based on the project planning time axis; the rechecking module is used for acquiring engineering project image information on site, performing fuzzy comparison on the real-time three-dimensional model, and determining whether the project progress is real or not basedon the material consumption information; the method has the effects of randomly extracting observation data based on the acquired image information and preventing the phenomenon of work stealing and material reduction of the engineering project.

Description

technical field [0001] The invention relates to the technical field of project cost data management, in particular to a project cost data management system and method. Background technique [0002] At present, the project cost refers to the construction price of the project, which refers to the sum of all the expected or actual costs required to complete the construction of a project; defined from the perspective of the owner, the project cost refers to the construction cost of the project, which is the cost All fixed asset investment expenses that are expected to be paid or actually paid for the project; these expenses mainly include equipment and tool purchase expenses, construction engineering and installation engineering expenses, other project construction expenses, reserve expenses, interest during the construction period, fixed asset investment direction adjustment tax ( This fee is currently suspended); although these fees do not fully form the value of new fixed ass...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q50/08G06T17/00
CPCG06Q10/04G06Q50/08G06T17/00G06T2210/04G06T2200/08Y02P90/30
Inventor 李建华
Owner 北京兴中海建工程造价咨询有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products