Responsibility division comprehensive analysis method and system for source network load power failure users
A technology of power failure and user responsibility, applied in resources, data processing applications, instruments, etc., can solve problems such as poor scalability, economic security issues, and limited service life
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0072] Embodiment one, such as image 3 Shown: When the real-time line voltage is a single-phase voltage, and the user current is a single-phase current: a comprehensive analysis method for the division of user responsibilities for source-grid-load power faults, including the following steps:
[0073] Step S01: Obtain the line voltage U at the rated frequency of 0.1s i and the user current I to get the user rated current I 额定 , management capacity Q 额定 ;
[0074] Step S02: Encoding the circuit according to the direct position distribution of the power supply line. Through topology analysis, get the trunk lines and user branch lines;
[0075] Topology analysis:
[0076] Input: line ID, line start ID, line end ID, master meter ID, user ID;
[0077] process:
[0078] 1. Traversing the total meter ID, looping to find all line IDs and user IDs that are connected to the total meter ID, and obtaining a physical feeder tree with the same number of total meters.
[0079] 2. Acc...
Embodiment 2
[0096] Embodiment two, such as Figure 4 Shown: When the real-time line voltage is a three-phase voltage and the user current is a three-phase current: a comprehensive analysis method for user responsibility division of source-grid-load power faults, including the following steps:
[0097] Step S01: Obtain the line voltage U at the rated frequency of 0.1s ai , U bi , U ci and the user current I to get the user rated current I 额定 , management capacity Q 额定 ;
[0098] Step S02: Encoding the circuit according to the direct position distribution of the power supply line. Through topology analysis, get the trunk lines and user branch lines;
[0099] Topology analysis:
[0100] Input: line ID, line start ID, line end ID, master meter ID, user ID;
[0101] process:
[0102] 1. Traversing the total meter ID, looping to find all line IDs and user IDs that are connected to the total meter ID, and obtaining a physical feeder tree with the same number of total meters.
[0103] 2...