Imbibition oil displacement effect evaluation device and use method thereof
An evaluation device and imbibition technology, which is applied in the direction of earthwork drilling, production fluid, wellbore/well components, etc., can solve the problems that the fracturing process and formation temperature and pressure conditions cannot be simulated, and achieve the effect of wide coverage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0060] Set the permeability to 1.1×10 -3 μm 2 After the natural core is fully saturated with crude oil, it is installed on the first acid and alkali resistant core holder 13, closes the first solution inlet valve 11 and the first outlet valve 16, and opens the confining pressure outlet main valve 21 and the first confining pressure inlet Valve 17, the manual pump 22 is used to add confining pressure to the first acid and alkali resistant core holder 13; the vent valve 3 connected to the first piston container 2 is closed, and 1L formula fracturing fluid is added to the first piston container 2 , Fracturing fluid formula: 0.3% hydroxypropyl guar gum + 1% potassium chloride + 0.1% fungicide CJSJ-1 + 0.3% osmotic agent CRS + 0.03% breaker ammonium persulfate, until the fracturing fluid is broken Then, open the solution outlet valve 5 connected to the first piston container 2 and the corresponding valves on the pressurizing valve 4 and the six-way valve 9, turn on the piston contain...
Embodiment 2
[0062] Set the permeability to 1.08×10 -3 μm 2 After the natural core is fully saturated with crude oil, it is installed on the second acid and alkali resistant core holder 12, the second solution inlet valve 10 and the second outlet valve 15 are closed, and the confining pressure outlet main valve 21 and the second confining pressure inlet are opened Valve 20 uses a manual pump 22 to add confining pressure to the second acid and alkali-resistant core holder 12; close the vent valve 3 connected to the second piston vessel 6, and add 1L of formula 2 fracturing fluid to the second piston vessel 6 , Fracturing fluid formula: 0.3% hydroxypropyl guar gum + 1% potassium chloride + 0.1% fungicide CJSJ-1 + 0.3% osmotic agent TGF-1 + 0.03% breaker ammonium persulfate, waiting for fracturing fluid After breaking the glue, open the solution outlet valve 5 connected with the second piston container 6 and the corresponding valves on the pressurizing valve 4 and the six-way valve 9, turn on t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
