Vehicle pile identity rapid identification risk control method and system
A risk control and risk control technology, applied in the field of information security applications, can solve problems such as high economic and social costs, inability to meet widespread implementation, and inability to apply, and achieve the effect of reducing the risk of counterfeiting
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0052] A schematic flow chart of a risk control method for rapid identification of vehicle pile identity provided by the present invention is as follows figure 1 shown, including:
[0053] Step 1: Calculate the preset risk control indicators based on the charging behavior of each charging pile in the current charging vehicle monitoring cycle;
[0054] Step 2: Determine the risk of risk control based on the values of all risk control indicators;
[0055] Step 3: Based on the risk control risk, identify the abnormal risk situation of the identity of the charging car.
[0056] In this embodiment, the risk control risk is determined by the risk control index, and the risk control index is used to represent the overall risk level of each risk control index.
[0057] According to the scene characteristics of low-frequency and small amount of user charging consumption, in order to effectively control and reduce the operation risk of user account and fund theft caused by the forge...
Embodiment 2
[0084] Based on the same inventive concept, the present invention also provides a risk control system for rapid vehicle identification identification. Since the principles of these devices to solve technical problems are similar to the risk control method for rapid identification of vehicle identification, the repetitions will not be repeated.
[0085] The basic structure of the system is as Figure 7 As shown, including: indicator calculation module, risk control module and identification module;
[0086] Among them, the indicator calculation module is used to calculate the preset risk control indicators based on the charging behavior of each charging pile in the current charging vehicle monitoring cycle;
[0087] The wind control risk module is used to determine the risk control risk according to the values of all risk control indicators;
[0088] The identification module is used to identify the abnormal risk situation of the identity of the charging car based on the ris...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


