A kind of equipment and process for preparing asphalt mixture
A technology for asphalt mixture and equipment, which is applied in the field of equipment and technology for preparing asphalt mixture, can solve the problems of increasing the purchase cost of the powder elevator, easily adhering to the drying drum, increasing the dust leakage point, etc., so as to achieve a convenient workshop. The effect of building, avoiding heat loss and reducing equipment cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0092] Example 1: Prepare asphalt mixture with pure raw materials.
[0093] This embodiment is only the primary unit, according to the grading requirements, the raw materials such as sand and gravel materials are continuously measured and sent to the raw material drying and heating system for heating, and the dried and heated raw materials are continuously sent to the mixing system, and the raw materials according to the grade It is mixed with asphalt that requires continuous metering and recycled powder to form a high-quality asphalt mixture. Specifically:
[0094] Before the official production, the asphalt tank 91 in the asphalt supply system 9 is heated by heating the bitumen heavy oil, and the asphalt tank flue gas treatment system 1a and the powder spraying system 8 are started at the same time to "powder" the asphalt fume generated by the bitumen tank 91. Wrapped in smoke" treatment. When the temperature of the asphalt heavy oil reaches the production temperature, it ...
Embodiment 2
[0095] Embodiment 2: Asphalt mixture is prepared by adding a certain proportion of recycled materials to raw materials.
[0096] This embodiment is to simultaneously open the original unit and the regeneration unit. According to the gradation requirements, the raw materials such as sand and gravel are continuously measured and transported to the raw material drying and heating system for heating, and the dried and heated aggregate is continuously sent to the mixing system. Stir with recycled materials continuously metered according to gradation requirements (regenerated materials are stirred while drying and heating in the primary mixing tank and primary mixing tank), regeneration additives (addition or non-addition is optional), asphalt, and recycled powder to prepare asphalt Mixture. Specifically:
[0097] The addition method of raw materials is the same as that of Embodiment 1, and will not be repeated. The addition of recycled materials is to add a certain proportion of ...
Embodiment 3
[0098] Example 3: Asphalt mixture was prepared by hot mixing all recycled materials.
[0099] In this embodiment, only the regeneration unit needs to be opened, and the opening method of the regeneration unit is the same as that of the third embodiment, that is, the regeneration hot air generation system 4a, the regeneration cold material elevator 226, the regeneration inclined belt conveyor 225, the regeneration coarse screen 224, and the regeneration aggregate are sequentially started. Belt conveyor 223, each regenerative belt scale 222 and its corresponding regenerative variable frequency feeding belt conveyor 221, each regenerative belt scale 222 and its corresponding regenerative variable frequency feeding belt conveyor 221 should be opened from far away from the regenerative cold material hoist 226 to The directions of the regenerative cold material elevator 226 start with a delay in turn. At the same time, start the original large bag dust removal system 6, the original...