Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for power grid power supply point tracking module

A power grid power and power point technology, applied in the field of power grid power point tracking modules, can solve the problems of high error rate, complicated power point tracking process, and difficulty in meeting the expansion of power grid scale.

Pending Publication Date: 2021-01-08
XINING POWER SUPPLY CO OF STATE GRID QINGHAI ELECTRIC POWER CO +2
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the rapid development of the economy, in the process of formulating the power dispatching operation mode and formulating the power protection plan for various large-scale activities, the power department control team needs to carry out more and more power point tracking operations. The power point used by the previous power dispatcher The tracking process is relatively complicated. Given this problem, the dispatching team selected 10 power conservation plans over the years, and calculated the average time for tracking a single power point in the plan in the DTS system; manually checking the power point was time-consuming and laborious, with an average of 3 minutes and a high error rate. Therefore, it is urgent to develop a new automatic device to complete the power point tracking work.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for power grid power supply point tracking module
  • Method for power grid power supply point tracking module
  • Method for power grid power supply point tracking module

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0114] Embodiment 1, a method for a grid power point tracking module, is characterized in that: start → open the screen → select a route → start the tracking module → obtain the power point → end.

[0115] The selected route is based on the D5000 system, and an instruction for designing and extracting key fields is designed;

[0116] In the database of the D5000 system, dev_id is an identification field, which is unique and non-repeatable. Because of this feature, the dev_id field appears in many database tables and is used as a link between tables for correlation and retrieval. "Bridge" is also a key field for distinguishing equipment, values, and formulas.

[0117] The code part of the tracking module is as follows:

[0118] Call access part:

[0119] include

[0120] include

[0121] include "time.h"

[0122] include "ImdsPub.h"

[0123] include "ImdsPowerPath.h"

[0124] include "db_def / db_define.h"

[0125] include .

[0126] The time...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A method for a power grid power supply point tracking module relates to the technical field of power dispatching and comprises the steps of starting, opening a picture, selecting a route, starting thetracking module, obtaining a power supply point and ending. The method has the beneficial effects that the tracking accuracy is 100%, the method is safe and reliable, and the error rate of manual retrieval is reduced; by using the power supply point tracking module, the compilation time of an electricity protection plan is greatly reduced, the workload of a dispatcher is reduced, overtime due tomaking of a first-level plan is avoided, and overtime expenses are saved; meanwhile, an effective basis is provided for dispatcher accident handling, the accident handling time is shortened, and losses caused by power failure are reduced. By using the scheduling system power supply point tracking module, the power supply point tracking time is greatly shortened, the accuracy is ensured, and the formulation of the power supply protection plan is more efficient. In addition, the development of various major activities is powerfully guaranteed through the reinforcement of the power protection means.

Description

technical field [0001] The invention relates to the technical field of electric power dispatching, in particular to a method for tracking a power grid power point module. Background technique [0002] With the rapid development of the economy, in the process of formulating the power dispatching operation mode and formulating the power protection plan for various large-scale activities, the power department control team needs to carry out more and more power point tracking operations. The power point used by the previous power dispatcher The tracking process is relatively complicated. Given this problem, the dispatching team selected 10 power conservation plans over the years, and calculated the average time of tracking a single power point in the plan in the DTS system; manually checking the power point was time-consuming and laborious, with an average of 3 minutes and a high error rate. Therefore, it is urgent to develop a new automatic device to complete the power point tr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/06
CPCG06Q10/047G06Q10/0633G06Q50/06
Inventor 李芸马忠英雷晓宇祁鹏林蒋华婷袁复兴李延昕孟凡坤王国栋薛原张赢车国芳单韶英朱雪莲张国荣赵浩渊蒋文丽郭渊辉王瑞东
Owner XINING POWER SUPPLY CO OF STATE GRID QINGHAI ELECTRIC POWER CO
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products