System for realizing enterprise-level engineering project cost management and control

An engineering project, enterprise-level technology, applied in the system field of realizing enterprise-level engineering project cost control, can solve the problems of out-of-control project overall cost, inability to pre-manage and control cost, and inability to quickly and accurately reflect the actual situation of the project, etc., to achieve a solution The Effects of Information Silos, Broad Applicability, and Promotable Value

Pending Publication Date: 2021-01-22
杭州新中大科技股份有限公司
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] 1) The management of a single project department leads to the management of the project department at the headquarters can only stay on various reports, which cannot quickly and accurately reflect the actual situation of the project, the management is difficult, and the comprehensive management cost is high;
[0004] 2) The management of a single project department also cannot form a scale effect, and it is difficult to save management costs;
[0005] 3) For some large-scale group projects with multiple sub-projects, the management of a single project department can only control the cost of sub-projects, resulting in loss of control of the cost of large-scale group projects;
[0006] 4) In the existing mainstream cost control methods, the monitoring and control of costs can only be carried out when costs occur, and cannot be managed and controlled in advance when costs are about to occur
[0007] A new type of cost management system is urgently needed to overcome and solve the potential risks of lower management efficiency and out-of-control project overall costs that may be caused by the above problems

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • System for realizing enterprise-level engineering project cost management and control

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0044] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0045] It should be noted that, in the case of no conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.

[0046] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but not as a limitation of the present invention.

[0047] Aiming at the above-mentioned problems existing in the prior art, a system for realizing cost control of ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a system for realizing enterprise-level engineering project cost management and control. The system specifically comprises a management unit, a distribution unit, a storage unit, a monitoring unit, a cost control unit and an analysis unit. According to the technical scheme, project decomposition and cost decomposition are carried out on the engineering construction project and then combined compilation is carried out, and the cost control unit is used for carrying out effective supervision and regulation on the generated and imminent cost generation requests, so that resource integration of all project departments and cost integrated management of group-level projects are realized; the information island problem in an existing management system is effectively solved,and wide applicability and promotable value are achieved.

Description

technical field [0001] The invention relates to the technical field of engineering management, in particular to a system for realizing cost management and control of enterprise-level engineering projects. Background technique [0002] With the development of Internet technology, the demand of engineering construction enterprises for informatization business has also expanded from the early single project department management to enterprise-level and group-level integrated information management. In this context, most of the subdivided project departments of engineering construction companies are very scattered. If the single project department management method in the existing technology is still adopted, it is easy to have the following problems: [0003] 1) The management of a single project department leads to the management of the project department at the headquarters can only stay on various reports, which cannot quickly and accurately reflect the actual situation of t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08
CPCG06Q10/06313G06Q10/103G06Q50/08
Inventor 陈益建李伯鸣朱世潮
Owner 杭州新中大科技股份有限公司