Novel building backfill material
A kind of architectural and new technology, applied in the field of underground engineering construction, can solve the problems of long construction period, hollowing out of the fertilizer tank, and difficulty in excavating the fertilizer tank, and achieve the effect of backfilling with excellent work efficiency, quality and reasonable design
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0026] see figure 1 , a new type of building backfill material, including base material, cementitious material, admixture and water; said base material adopts the spoil when the building foundation pit is excavated, the maximum particle size of the soil particle is less than 5cm, and the organic matter content in the soil is less than 5%. , the water content is 10%-20%, the cementing material adopts ordinary Portland cement P.O42.5, the dosage of...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


