Wellbore cementing system
A wellbore and control system technology, applied in the direction of wellbore/well components, flushing wellbore, drilling automatic control system, etc., can solve the problems of delayed completion of WOC time and increase of completion cost, and achieve the goal of shortening WOC time Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] Example systems and techniques for cementing a portion of a wellbore are described in this specification. In one example, the casing lines a portion of the wellbore. A pipe called a cement stinger is inserted downhole through the casing and into the unlined portion of the wellbore. At the end of the pipeline, the pipeline includes substructures, called sub-blocks. In this example, the substructure is a shear substructure that includes a shear pin configured for rotation. A pump, which may be located at the surface, forces the cement slurry through the pipes and through the substructure. Cement paste includes capsules containing accelerators. The accelerator reacts with the cement slurry to affect (eg, shorten) the wait-on-set (WOC) or thickening time of the cement slurry.
[0026] The bladder releases the accelerator into the cement slurry, causing the cement slurry to thicken more quickly than a cement slurry of the same composition but without the accelerator. In...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


