[0031] In order to further explain the technical means and effects adopted by the present invention to achieve the intended invention purpose, below in conjunction with the accompanying drawings and preferred embodiments, the whole segment of the steel truss girder of a long-span cable-stayed bridge on a beach proposed according to the present invention is symmetrically doubled. The specific implementation and working principle of the cantilever erection method will be described in detail.
[0032] The embodiment of the present invention provides a method for erecting symmetrical double cantilevers in the whole segment of a long-span cable-stayed bridge steel truss girder on a beach. The specific implementation process is as follows:
[0033] Step 1: the main tower foundation 3-1 construction, meanwhile, two columns of buttress piers 5 are set along the direction of transporting the entire section steel truss beam 1 on the beach, and the slideway beam 4 is set at the pier top o...