Crane control method and system and crane
A control method, crane technology, applied in the direction of load hanging components, transportation and packaging, etc., can solve problems such as failure of crane legs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0101] This embodiment provides a crane control method, such as figure 1 shown, including:
[0102] An aspect of the present application relates to a crane control method comprising:
[0103] S2, collect the outrigger travel and outrigger control signals of the crane; collect the lifting force signal of the crane; collect image data of the crane load and environment, and obtain the load height of the crane;
[0104] S4, according to the outrigger stroke of the crane and the outrigger control signal, judge the accident state of the outrigger of the crane; according to the judgment result of the accident state of the outrigger of the crane, perform data processing on the relevant data;
[0105] S6, outputting and executing the result of data processing.
[0106] It should be noted that this embodiment provides a crane control method to solve the problem of outrigger failure of the crane in the related art. In order to solve this problem, it is necessary to collect the outrigg...
no. 2 example
[0166] This embodiment provides a crane control system, such as figure 2 shown, including:
[0167] The detection module 2 is used to collect the stroke of the outrigger of the crane and the control signal of the outrigger; collect the lifting force signal of the crane; collect the image data of the crane load and the environment 82, and obtain the load height of the crane;
[0168] The control module 4 is used for judging the accident status of the crane outrigger according to the stroke of the crane outrigger and the control signal of the outrigger; according to the judgment result of the accident status of the crane outrigger, data processing is performed on relevant data;
[0169] The execution mechanism 6 is used to output and execute the result of data processing.
[0170] It should be noted that this embodiment provides a crane control system to solve the problem of outrigger failure of the crane in the related art. Collect the crane outrigger stroke and the outrigge...
no. 3 example
[0212] This embodiment provides a crane, including the above-mentioned crane control system.
[0213] In this embodiment, by adopting the crane control system in the above embodiment, the beneficial effects brought by the crane control system in the above embodiment are realized, and the occurrence of tipping can be prevented, or the damage caused by tipping can be reduced, thereby improving the safety of the crane. job security.
[0214] In addition, it should be noted that in this article, relative terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or Any such actual relationship or order between such entities or operations is implied.