Unlock instant, AI-driven research and patent intelligence for your innovation.

Engineering project real-time data synchronization management and control system

An engineering project and real-time data technology, applied in the field of engineering construction, can solve problems such as inability to supervise engineering project construction, delay in work, and inability to understand the progress of the project site in a timely and intuitive manner.

Active Publication Date: 2021-05-11
GUANGXI ROAD & BRIDGE ENG GRP CO LTD
View PDF6 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, it is still difficult to solve the problem of slow data synchronization when modeling engineering projects through software, which makes it impossible for senior leaders to understand the progress of the project site in a timely and intuitive manner, so that they cannot effectively supervise the construction of engineering projects
Moreover, the progress of project construction is closely related to materials. When the construction plan is not synchronized with the material demand plan, it will lead to delays in work and delays in progress due to untimely supply of materials.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering project real-time data synchronization management and control system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

[0040] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terms used herein in the description of the present invention are for the purpose of describing specific embodiments only, and are not intended to limit the present invention. As used herein, the term "and / or" includes any and all combinati...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of engineering construction, in particular to an engineering project real-time data synchronous management and control system, which comprises a modeling module used for establishing a three-dimensional model of an engineering project; an information platform the data of which can be displayed in the three-dimensional model, and which comprises a material management module, a progress management module and a personnel arrangement module and is used for managing materials, engineering project progress and personnel; an off-site information terminal used for acquiring the data of the progress management module so as to carry out construction, progress filling and material filling of the project engineering according to the progress. The information platform further comprises a progress early warning module which is used for judging whether the material surplus of the field engineering project meets the actual progress requirement or not according to the actual progress condition and the material condition. The engineering project information can be synchronized in real time, the materials of the engineering project are prevented from influencing the plan progress, and the construction progress of the engineering project is ensured.

Description

technical field [0001] The invention relates to the technical field of engineering construction, in particular to a real-time data synchronization management and control system for engineering projects. Background technique [0002] With the development of the city and the progress of the society, the construction project management is more and more necessary. Today, with the popularization of engineering management systems, software has become an important carrier of information exchange. In the construction industry, engineering project management can be realized through software modeling, and a mature project management ecosystem can be constructed to run through the entire engineering management system. [0003] However, at present, it is still difficult to solve the problem of slow data synchronization through software modeling of engineering projects, which makes it impossible for senior leaders to intuitively understand the progress of the project site in a timely man...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q50/08G06T17/00G06F16/27
CPCG06Q10/06313G06Q50/08G06T17/00G06F16/27
Inventor 孙辉马文安杜海龙韩玉林广泰李彩霞解威威覃献康肖军军何健徐梓荣王勇朱觉文谢灿荣蒋严波梁才郑健侯泽群陈孝强李雍友程振庭程立飞李威欧晨丰赵志强
Owner GUANGXI ROAD & BRIDGE ENG GRP CO LTD