[0045] Such as figure 1 , 2 3, the present embodiment discloses a mounting device of a bearing guard, including: a body 10, a body 10 disposed on a plane, and the body 10 includes: the conveying frame 101, the surface of the conveying frame 101 having a groove, conveying The inside of the groove of the frame 101 is provided with a conveyor belt 105, and the conveyor belt 105 is active, and the surface placement bearing 60 of the conveying frame 101; the fixing frame 102, the mount 102 is disposed on the right side of the conveying frame 101, the fixing frame 102 The upper surface of the casing 102 is flush with the upper surface of the sleeve 102 and the upper surface of the conveying strip 105; the pushing device 103 is disposed on the side surface of the fixing frame 102, the pushing device 103 is fixed to the fixing frame 102, push The initial position of the push end of the device 103 does not exceed the inner surface of the opening end of the conveying frame 101; the transmis...
Embodiment 2
[0056] As in the example, if Figure 5 , 6 As shown, it is also included, and the barrier plate 204 is arranged to be a L-shaped, and the flow holes 2011 inside the lifting casing 107 are provided with five, the lateral plate of the barrier plate 204 blocks the ends of the lifting shell 107, two flow holes 2011, barrier plate 204 The vertical transverse plate blocks the three flow holes 2011 inside the lifting shell 107, and the three flow holes 2011 inside the lifting shell 107 are released when the barrier plate 204 is blocked, and the three flow holes 2011 inside the lifting shell 107 are released. The barrier plate 204 is reached in the main city circle to the limit of the two flow holes 2011 of the end of the lifting shell 107. By setting the barrier plate 204 to the L shape, the vertical plate of the barrier plate 204 will release the partition of the flow hole 2011 of the lifting shell 107, first, three flow holes of the lifting shell 107, first after the barrier plate 204 i...
Embodiment 3
[0058] Such as Figure 8 As shown, it is finally provided that a mounting method of the mounting device of the bearing 60 guard pad 70 includes the following steps:
[0059] When the bearing 60 is placed in the inside of the conveying frame 101, the bearing 60 is moved to the pressing device 20, and when the bearing 60 is moved to the front, the lifting device 40 moves down the push device 30 downward. Move, the extrusion device 20 mating with the lift device 40 also moves down;
[0060] The lifting shell 107 stops moving downward by the lift device 40 to the surface of the bonding bearing 60, the push plate 303 of the pushing device 30 moves to the left by the moving module 301, and the protective pad 70 is pushed into the lifting of the guard pad 70 through the push plate 303. The inside of the cartridge 201, the protective pad 70 is moved downward by the extrusion device 20 by the extrusion device 20, and the flow hole 2011 of the lifting cartridge 201 is moved downward and the ...